BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 16, 2026 at 8:00 PM

Updated May 16, 2026

Site work and new construction of a sidewalk / parking lot in Farmingville, New York. Completed plans call for the construction of a sidewalk / parking lot.

Build Wooden Platform and H.C. Ramp. When submitting your quote, include a cost breakdown (materials, labor, overhead) and list number. Attendance at a site visit is mandatory prior to submitting a quote. Review the attached scope of work and any supporting documents. When submitting your quote, include the attached quote proposal form and a detailed cost breakdown showing the materials (detailed breakdown of materials required), equipment costs, and labor costs in accordance with the project specifications and prevailing wages. A cost breakdown form is provided. Vendors and sub-contractors must be registered with NYS DOL and a copy of the certificate must be sent with your quote. Work is to be completed within 28 days of award. Any questions or requests for clarification regarding the information provided may be directed to Brooklyn.CMM.Bids@opwdd.ny.gov SCOPE OF WORK includes, but is not necessarily limited to the following: 1. Contractor is responsible to verify all measurements and quantities. 2. All work to meet the AHJ Codes and regulations. 3. Contractor is responsible to mark out all underground utilities before digging. 4. Equivalent substitutions of materials may be allowed with prior approval of OPWDD's architect. 5. OPWDD is the AHJ for the site. All changes to the design must be approved by the OPWDD architect or engineer first. 6. Contractor is responsible to coordinate with Fusion Architecture for progress inspections: 1) Excavation complete and forms, footings, and piers in place (before pouring concrete). 2) Structural Framing completed (no decking installed). 7. 3) 100% Completion. 8. Work is to be performed according to the Scope and or Plans provided for SOW#1 9. Contractor to provide all 3-party inspections or certifications if required.

Post-Bid

Sidewalks / Parking Lot

$50,000.00

Public - State/Provincial

New Construction, Site Work

8

5

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
926
Active Projects
472
Bidding Soon
4,780
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2026

June 8, 2026

Project location map

8 N Morris Ave, Farmingville, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.