BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 19, 2026

Site work, paving and outdoor lighting for a mixed-use development in San Diego, California. Working plans call for site work for a 10,838-square-foot playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This project is to provide for the design and construction of upgrades at the existing Officer Jeremy Henwood Memorial Park. The proposed project will replace the existing children's play areas and associated amenities, including play structures, seating, lighting, fencing, drainage and approximately 9,040 square feet of safety surfacing. The project would also install an Adult Fitness area with fitness equipment and approximately 2,100 square feet of safety surfacing. Additional improvements would include replacement of turf with ornamental landscaping, irrigation upgrades, and ADA accessibility improvements, such as comfort station amenities, path-of-travel upgrades, curb ramp installation and replacement, potentially concrete sidewalk replacement, and parking restriping. LICENSE REQUIREMENT: To be eligible for award of this contract, Prime contractor must possess the following licensing classification: A 7. CONTRACT PERIOD: The Project, including the Plant Establishment Period, shall be completed within 310 Working Days from the Notice to Proceed (NTP). 1. SLBE participation 1.9% 2. ELBE participation 1.9% 3. Total mandatory participation 3.8% Limited Notice to Proceed September 2026 The City reserves the right to award the Contract for the Base Bid only or for the Base Bid plus one or more Alternates. All questions related to this solicitation shall be submitted to: Abel Martinez, Contract Specialist at: MartinezAbel@sandiego.gov Question Deadline 04/21/2026 Drawing no - C24170PMR3 25 Confirmed Shortlist

Final Planning

Playgrounds / Parks / Athletic Fields

$2,900,000.00

Public - City

Outdoor Lighting, Paving, Site Work

10

6

2

4

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
270
Active Projects
113
Bidding Soon
1,688
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2026

September 1, 2026

Project location map

4455 Wightman St, San Diego, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.