BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 16, 2026 at 8:00 PM

Updated July 22, 2026

Site work for a bridge / tunnel in Manning, Alberta. Design plans call for site work for a bridge / tunnel.

BF72094-1 Major Bridge Replacement Carrying HWY 35 over Meikle River approx. 25.4 km North of Manning (Construction WAC0087005). BF74194-1 Major Bridge Replacement Carrying HWY 58 Over Bushe River approx. 4.5 km East of High Level (Construction WAC0086940). TIMELINE: RFP for engineering services has been awarded. The project is tentatively scheduled for construction between 2032 and 2034. Further update may be available fall/late 2026.

Design

Bridges / Tunnels

$20,000,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
1
Bidding Soon
32
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2026

Project location map

AB-35, Manning, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.