BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2026 at 8:00 PM

Updated May 14, 2026

New construction of a transportation facility in Littleton, Colorado. Completed plans call for the construction of a 9,504-square-foot transportation facility.

The County is seeking a qualified contractor to construct a new helicopter hangar near 8500 N Moore Rd. This project will include a 9,504 sq. ft hangar and related site work for the first responders of Douglas County. The condition of the site that the awarded contractor will find when beginning work will be as listed below: 1. The grading for the site will be completed to a rough margin of +/- 4" from the final grades as illustrated on the Civil drawings. 2. All GESC facilities will be left in place by others responsible for the rough grading. 3. The K9 training facility will be demolished and reinstalled off-site by the owner. The scope of site work to be carried out by the awarded contractor of this IFB will be as follows: 1. Final grading will be required, see unit pricing specification for a unit price per cubic yard of dirt moved. 2. Construction of the new temporary access road from Moore Rd. and related work will be required per Civil drawings. 3. Maintenance and continued use of the GESC facilities left in place will be required. 4. All hardscape and other site work as outlined below will be required. The hangar building scope consists of, but is not limited to: a pre-engineered metal building with bagged insulation and metal roof/wall panels, a small parking lot, and a large concrete helipad with an asphalt skirt. The interior of the new hangar includes, but is not limited to, the following: 1. A large, heated hangar space with a perimeter concrete stem wall and a 70' x 20' clear bifold hangar door 2. A finished and conditioned office space with full-height, fire-rated separation walls and non-rated interior partition walls 3. A storage mezzanine with fire-rated structure 4. A shop/storage area below the mezzanine with fire-rated separation walls 5. A small kitchenette with custom casework 6. Two new ADA bathrooms, one with a shower The contractor shall account for, protect, and preserve the working environment for the adjacent land during the scope of the work. All questions related to this IFB must be submitted ELECTRONICALLY ONLY to Tim Hallmark thallmar@douglas.co.us Questions will be received until April 28, 2026 at 5PM. Responses to all questions will be sent to all potential contractors no-later-than May 4, 2026 at 5PM. If it becomes necessary to revise any part of this IFB or if additional data is necessary to enable an exact interpretation of the provisions of this request, an addendum will be issued. It is the responsibility of the respondent to ensure that they have received all addendums prior to submitting their IFB response.

Post-Bid

Transportation Terminals

$1,000,000.00

Public - County

New Construction

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
92
Bidding Soon
1,051
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2026

July 6, 2026

Project location map

To Be Determined, Littleton, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.