BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 19, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a sidewalk / parking lot in Bellaire, Michigan. Completed plans call for site work for a sidewalk / parking lot.

Seeking a Concrete Contractor to remove and replace sidewalks at the Antrim County Building located at 203 E. Cayuga St. Bellaire, MI 49615. All necessary permits are the responsibility of the Contractor. The Contractor must be licensed and is responsible for obtaining the permits necessary to complete the work. The bid must include the cost of obtaining such permits and all labor necessary to complete the job. Awarded contractor shall provide a tentative schedule with their bid and a list of subcontractors that will be used on the project. County offices will remain open during the construction period and public access to the building must be maintained. Each bidder is responsible for attending a mandatory pre-bid site visit. Contact to arrange for a site visit is provided. Site visits are available Monday - Friday from the hours of 6:00 a.m. - 2:30 p.m. 1. Existing sidewalks to be removed and disposed of. (See yellow highlighted areas in Addendum A for sidewalk locations.) 2. Prepare and compact subbase - verify subbase is suitable. 3. Install new 4" thick concrete walks. 4. Concrete shall be fiber reinforced with the minimum specified compressive strength of 4000 psi (28 days). 5. The maximum in-place water to cement (w/c) or water to cementitious ratio (w/cm) shall be .045 or less. 6. Air content shall be designed for a total air content, by volume, of 6.5% +/- 1.5%. 7. Edge concrete perimeter with a maximum radius = 1/2 inch. 8. Apply a broomed texture. 9. Control joints shall be cut. 10. All workmanship and materials shall be according to the current MDOT standard specifications for construction. 11. Ensure proper surface drainage. 12. Contractor must restore and repair any existing conditions disturbed by construction. This is to include buried utilities lighting, landscaping, sprinkling, etc. 13. Any area disturbed by construction to be restored to condition equal to or better than before construction began. Questions regarding the bid specifications shall be directed to Mitch Bart at bartm@antrimcountymi.gov or 231-533-8819.

Post-Bid

Sidewalks / Parking Lot

$50,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
24
Bidding Soon
228
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2026

June 4, 2026

Project location map

203 E Cayuga St, Bellaire, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.