Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 14, 2026 at 8:00 PM
Updated May 14, 2026
Renovation of an educational facility in Quebec, Quebec. Completed plans call for the renovation of a educational facility.
Reference number: 20138350 Deadline for receipt of complaints 2026-04-27 There is provision for a tendering process for each tender No Electronic tender submission accepted Yes, via SEAO, with a document Expected duration of the contract without options (in months) 12 Type of the Tender guarantee : Marked check (certified check) Value of the Tender guarantee (amount or percentage) : 10% of total bid Description The Centre de services scolaire des Premieres-Seigneuries wishes to retain the services of a construction contractor for ventilation retrofitting work at Ecole des Cimes, located at 250, rue Cambert, Quebec (Quebec), G1B 3R8. Refer to the Regie document for the date of the site visit, which is not mandatory. Brief description of the work: This work is mainly electromechanical. Main works but not limited to: In plumbing Carry out the drainage work Heating Dismantling of a glycol heating coil Work on a glycol heating network Installation of a 3-way valve Installation of two glycol heating coils In ventilation Demolition work in ventilation Dismantling of a section of the ventilation system. Carry out insulation work on the ventilation ducts. Modification of the ventilation system box to acquire the DX coil and the new glycol coil. Fabrication is the installation of two drainage purlins Modification of a duct section of the ventilation system to acquire a new glycol coil. Supply and installation of two glycol heating coils The air balancing work. ETC. In refrigeration (subcontractor to the ventilation contractor) Supply and installation of heat pumps (C/A accessories; piping, isolation valves, liquid dryer, refrigerant charge, insulation, flexible joints, condenser control connection set, etc.) Two heat pumps with 55 KW of heating capacity and 49 KW of cooling capacity Supply and installation of a DX cooling coil. Installation of refrigeration piping. Insulation of the refrigeration piping. Finish covering of the external piping Etc. In regulation Remove and recover the control points of the removed mechanical equipment. Supply and connection (regulation) of variable speed drives Remove any unused control wiring Take control of the new equipment installed as part of this project and integrate it into the school's existing control sequences. Modification of the control mode for existing heating appliances Taking control of the heat pumps Place the charts on the servers of the school service center Etc. In electricity Connection of new mechanical equipment. Variable speed drives with filters. Heat pumps. Work on the existing fire alarm system. Displacement of the 'interlock' wire for stopping ventilation systems. Tests and delivery of the certificate of conformity. Etc. General contractor. Coordination of work with the various subcontractors Protection and movement of goods and furniture Concrete slab - including the work; Formwork. Armature. Concrete. Finishing. Etc. Excavation work. Location of the concrete slab. Etc. Backfill Supply of the backfill material. Compaction. Finishing of the land. Topsoil Peat roll Etc. Outdoor fences. Access barrier with lock. Hardware. Vertical slats of intimacy. Vandal-resistant sheet metal. Delivery schedule Start of work: June 29, 2026 End of the work: November 27, 2026 Completion schedule June 29, 2026 to November 27, 2026 (construction site) Clarification on the working schedule School leave period (June 29, 2026 to August 14, 2026) Daytime work will be allowed in the school. The work can also be carried out in the evenings and at night. Outdoor work on the school grounds may be carried out during the day during this period. However, the general contractor will be responsible for securing the outdoor work area. He will have to control the movement of material deliveries and the movement of his subcontractors. School term (26-27) - August 17, 2026 to November 27, 2026 o Outdoor work on the school grounds may be carried out during the day during this period. However, the general contractor will be responsible for securing the outdoor work area. He will have to control the movement of material deliveries and the movement of his subcontractors. To allow for the cleaning up of the school for the next school year, daytime work in the school will no longer be allowed from August 17, 2026. Work in the mechanical room will be able to proceed without restriction during the day until the arrival of the students on August 27, 2026. From August 27, 2026, work in the mechanical rooms can take place during the day. However, in order not to disturb the students, the contractor will have to carry out his noisiest work outside school hours. The weekend work in the school will be done in coordination with the client and will begin after 6 p.m. on Friday and must be carried out before 5 a.m. on Monday morning. The contractor must ensure that the corridors and classrooms are clean before the students arrive. During this period, the ceilings may remain open. However, the contractor must not leave anything hanging from the ceilings. During the school term (student presence), the A1/R1 ventilation system may be stopped for a maximum of 5 consecutive days. The energy management system will have to be functional as well. Week of November 16, 2026, provisional acceptance and submission of site completion documents. (TQC, maintenance manuals, letters of guarantee, ETC.) From November 16 to 26, 2026, corrections of deficiencies On November 27, 2026, final acceptance of the project.
Award
Educational
$454,240.00
Public - State/Provincial
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 5, 2026
June 29, 2026
250 Rue Cambert, Quebec, QC
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
