BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 16, 2026 at 8:00 PM

Updated May 16, 2026

This is a service / maintenance or supply contract in Bear Mountain, New York. Contact the soliciting agency for additional information.

The Office of Parks, Recreation and Historic Preservation (OPRHP) is seeking quotes for a new grit washer system to separate and remove sand and grit from wastewater treatment plants. The system must be fully operational in both manual and automatic modes. Specifications include: influent municipal waste, application peak flow 152,640 GPD, 6" inlet flange, 8" outlet flange, 25° screw incline, shaftless screw type, 9" screw diameter, 13’2" screw length, 9.5" trough diameter, U trough type, bolted inspection covers, 1/3” stainless steel liner bars, stainless steel 304L shaft, paddles, and body, and a ½ hp, 460v, 3 phase 60 Hz C1D2 drive. The control panel must operate the grit classifier, auger, and all ancillary equipment, be a stainless-steel enclosure, and contain all necessary electrical controls, wiring, starters, terminals, relays, overloads, fuses, and labels. System requirements include complete panel assembly, wiring, and testing, an inner swing panel for HMI, pilots, and disconnect, non-fused disconnect switch with thru-door handle, motor starters with fusing and overloads, control transformer with fusing, terminal blocks and accessories, electronic over current relays, elapsed time meter, control relays, local Class 1 Div 2 E-Stop switch, UL 508 rated enclosure suitable for wall mounting, and dry contact outputs for run, general fault, and overcurrent. A push button E-stop must be provided and installed adjacent to the grit system. Start-up services and training must include full documented QC with photos, a detailed video specific to this application showing equipment and controls functions and operation, and full startup and training on site for 1-2 days. Warranty must be 12 months or 18 months from delivery, whichever comes first. Bidders should submit their spec sheet along with the completed RFQ. CR#: 2133974

Post-Bid

Water / Sewer

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,078
Active Projects
539
Bidding Soon
5,514
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2026

June 4, 2026

Project location map

105 Iona Rd, Bear Mountain, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.