Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 30, 2026 at 8:00 PM
Updated May 15, 2026
Remodeling of a military facility in Albuquerque, New Mexico. Completed plans call for the remodel of a military facility.
The project consists of refurbishing and remodeling three existing kitchenettes within Building 1029. The Contractor shall provide all labor, supervision, services, materials, supplies, equipment, permits, investigations, studies, specifications, drawings, and coordination necessary for the design, ordering, and installation of a complete and fully functional project. All work shall be performed in strict compliance with all applicable federal requirements, the State of New Mexico codes as adopted and modified, and Kirtland Air Force Base building codes. Contractors shall review the Statement of Work and all attachments for detailed technical requirements, design criteria, and execution standards. If there questions regarding this solicitation, the site visit or if an offeror believes that there is discrepancies and ambiguities with these instructions, contain an error, omission, ambiguities, or are otherwise unsound, the offeror shall immediately notify the POC in writing with supporting rationale no later than 24 April 2026, , 5:00 PM (MST). Answers to the questions will be posted on SAM.gov by close of business on 1 May 2026. Remodel three break-rooms in Building 1029 at Kirtland Air Force Base, New Mexico. Work to include demolishing, removing, and replacing cabinetry, flooring, lights, fixtures, sinks, disposals, osmosis systems, ceiling tiles, etc. in their entirety. The Request for Proposal is for Work to include New Cabinetry and Countertops (high visibility, heavy use type) , New Fixtures/Sinks, New Garbage Disposals, New Commercial Tile Flooring/Base Cove, New Acoustic Ceilings/Grid, New Exhaust Fans, New LED Light Fixtures, New Paint, New Osmosis Systems, and remodeling of one kitchenette (Rooms 111 and 112). Work will include relocating electrical switches, outlets, and possibly thermostats. Dust mitigation is always a requirement, so the contractor shall minimize all dust from entering non-work areas during this project. Work shall include phasing each kitchenette to allow one or two kitchenettes to remain operational. Reference Attachments 2 and 3 for locations. 2.1.1. BUILDING 1029, ROOM 111 AND 112 KITCHENETTES (Combine rooms to make one Kitchenette/Break area). o Room 111 - Approximately 11'7" x 6' (70 SQFT) o Room 112 - Approximately 11'7" x 9' (105 SQFT) 2.1.1.1. Create a walk-thru opening into the adjacent room (112). Remove and relocate existing outlets. (One inside Room 111 and one in Room 112). 2.1.1.2. Demolish and remove existing cabinetry, sink, osmosis system, tile flooring, base cove, acoustic ceiling tiles, ceiling fan, ceiling grid and carpet (in Room 112). 2.1.1.3. Cap existing water and sewer line while exposed pending new installation of new sink/fixtures etc. Ensure they are safe and secure during construction. 2.1.1.4. Relocate Room 111 light switch to inside the room to location required by Code. Note, thermostat, outlets and switches shall be relocated where required. 2.1.1.5. Seal opening/entrance to Room 111, install base cove, tape, texture paint to match existing adjacent exterior hallway. 2.1.1.6. Room 111 and 112 shall receive new commercial tile and base cove throughout. 2.1.1.7. Both rooms shall receive new paint throughout. 2.1.1.8. Install ceiling tiles/grid and ceiling fan. 2.1.1.6. Install New Cabinetry/Countertops, and New Sink, Disposal, Osmosis system and ensure proper connection to water/sewer services. o NOTE: Cabinetry should be approximately 11 feet long, standard depth. 2.1.2. BUILDING 1029 ROOM 224 KITCHENETTE o Room 224 - Approximately 11'7" x 7' (81 SQFT) 2.1.2.1. Demolish and remove existing cabinetry, sink, osmosis system, tile flooring, base cove, acoustic ceiling tiles, ceiling fan, ceiling grid (where applicable). Do not touch/disturb gray junction box inside this room. 2.1.2.2. Cap existing water and sewer line while exposed pending new installation of new sink/fixtures etc. Ensure they are safe and secure during construction. 2.1.2.3. Inside Room 224 shall receive new paint throughout. 2.1.2.4. Install new floor tiles, threshold, base cove, ceiling tiles/grid and ceiling fan. 2.1.2.5. Install New Cabinetry/Countertops, and New Sink, Disposal, Osmosis system and ensure proper connection to water/ sewer services. o NOTE: Cabinetry should be approximately 8' feet long, standard depth. 2.1.3. BUILDING 1029 ROOM 401 KITCHENETTE Room 401 - Approximately 5' x 6' (30 SQFT) 2.1.3.1. Demolish and remove existing cabinetry, sink, osmosis system, tile flooring, base cove, acoustic ceiling tiles, ceiling fan, ceiling grid (where applicable). 2.1.3.2. Cap existing water and sewer line while exposed pending new installation of new sink/fixtures etc. Ensure they are safe and secure during construction. 2.1.3.3. Inside Room 401 shall receive new paint throughout 2.1.3.4. Install new floor tiles, threshold, base cove, ceiling tiles/grid and ceiling fan. 2.1.3.5. Install New Cabinetry/Countertops, and New Sink, Disposal, Osmosis system and ensure proper connection to water/sewer services. o NOTE: Cabinetry should be approximately 3' feet long, standard depth
Post-Bid
Military
$10,000,000.00
Public - Federal
Remodeling
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2026
July 7, 2026
To Be Determined, Albuquerque, NM
Related To This Project
Albuquerque, NM
Bid Date: May 08 2026
Albuquerque, NM
Bid Date: May 01 2026
Albuquerque, NM
--
Albuquerque, NM
--
Albuquerque, NM
--
Albuquerque, NM
Bid Date: May 11 2026
Albuquerque, NM
Bid Date: Jun 03 2026
Albuquerque, NM
Bid Date: Apr 27 2026
Albuquerque, NM
Bid Date: Jun 08 2026
Albuquerque, NM
--
Albuquerque, NM
Bid Date: Jun 04 2026
Albuquerque, NM
Bid Date: Jun 03 2026
Albuquerque, NM
Bid Date: May 13 2026
Albuquerque, NM
Bid Date: Apr 23 2026
Albuquerque, NM
Bid Date: Jun 16 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.