Published April 30, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Telluride, Colorado. Completed plans call for site work for a water / sewer project.

Reference Number 0000420785 1. Contractor shall submit work & sequencing plan to install PRV off center from existing main (for example: set PRV, prep bends, thrust blocks, pipe joint connections and restraint back to main, perform outage, install tees and gate valves, thrust blocks and restraint to existing main, connect to existing water, perform start-up of PRV in coordination with Pipestone, disinfection testing in coordination with Public Works (approximately 60' of new pipe install), perform outage, cut and cap existing 10-inch DIP. a. (East connection - Pressure Class 350): Install approximately 20-LF DIP and two (2) 45-degree DIP bends inclusive of mechanical joints, mega lugs, all-thread, concrete thrust blocks, 10-inch gate valve FLG x FLG, and 10x10 tee on existing main. b. (West connection - Pressure Class 250): Install approximately 20-LF DIP and two (2) 45-degree DIP bends inclusive of mechanical joints, mega lugs, all-thread, concrete thrust blocks 10-inch FLGxFLG gate valve, and 10x10x10x8 cross on existing main. 2. Water Outage Impacted Customers: Sunnyside, Hillside, Eider Creek, and TRWWTP 3. PRV inlet is east side of new vault. 4. PRV outlet is on the west side of new vault. 5. Contractor shall coordinate a workday (or late night) outage for DIP HP water main in coordination with Public Works to provide 72- hour notice to impacted customers. 6. Contractor must propose means and methods prior to start of work and is limited to a water outage that does not exceed six (6) hours total in any 24-hour period. 7. Contractor shall perform a soil proctor test prior to backfill and thrust block activities. Allow 7-10 days for optimum density & moisture lab results. 90% compaction is needed in a green space. 8. A minimum of 12-inches of Class 1 shall be set as vault base. Source ID PU.AG.USA.1944001.C17193476 Piggyback Contract No Question Deadline 04/21/2026 at 4:00 PM MT Questions are submitted online No

Post-Bid

Water / Sewer

$200,000.00

Public - City

Site Work

8

11

3

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
20
Bidding Soon
167
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2026

May 19, 2026

Project location map

Mill Creek Trail, Telluride, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.