BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 15, 2026

Renovation of an educational facility in Edmond, Oklahoma. Completed plans call for the renovation of a educational facility.

Bid Package Number Description Bid Package #2A Demolition Bid Package #4A Masonry Bid Package #6A Millwork Bid Package #6B Rough Carpentry & Furniture Restoration Bid Package #8A Doors, Frames & Hardware Bid Package #8B Storefront, Curtainwall, Glass & Glazing Bid Package #8C Stained Glass Restoration Bid Package #9A Framing, Drywall & Ceilings Bid Package #9B Painting & Coating Bid Package #9C Flooring, Carpeting, Tile & Wall Base Bid Package #10A Specialties Bid Package #10B Signage Bid Package #22A Plumbing Bid Package #23A HVAC Bid Package #26A Electrical Bid Package #32A Fences & Gates. Bidders will be required to provide Bid Security in the form of a Bid Bond in the amount of five (5) percent of the bid amount if the bid is over $50,000.00 (material vendors not required). The University of Central Oklahoma and Timberlake Construction Co., Inc. reserve the right to waive any informality and accept or reject any or all bids. The intent of this bid request is to obtain offers to perform the work to furnish and install all work for the UCO Y-Chapel Renovation. Direct question in writing to Cash Pool via e-mail at: estimating@timberlakeconstruction.com . Clarifications requested by bidders must be in writing not less than 7 days before date set for receipt of bids. Project Specific Scope 1. Coordination with the framing and millwork contractors for space requirements in the access panel area in the Chapel is required. Confirm dimensions needed for equipment before framing starts. 2. Demolition of the existing HVAC unit will be after the tape, bed, and first coat of paint is finished. This unit will condition the building on a temporary basis and will need to be maintained until it is time for the demolition. TCI superintendent will coordinate demolition with HVAC contractor. 3. See material schedules for equipment provided and installed by this scope on sheet M-600. 4. Relocation and installation of any existing mechanical items are included.

Post-Bid

Educational

$2,000,000.00

Public - State/Provincial

Renovation

40

9

10

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
76
Bidding Soon
753
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2026

June 10, 2026

Project location map

100 N University Dr, Edmond, OK


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.