BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 14, 2026

Site work and paving for a road / highway in Fruita, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

https://www.skyhinews.com/news/colorado-floyd-hill-bridge-construction-closures-i-70/ Bridge construction will require 5 overnight closures of I-70 near Floyd Hill this month The westbound I-70 closures will require a brief detour, according to the Colorado Department of Transportation NewsNews | May 7, 2026 Sky-Hi News staff report Follow news@skyhinews.com Share this story A crane works near a bridge piling Wednesday, Nov. 12, 2025, where the Colorado Department of Transportation plans to construct a new bridge and reconfigure Interstate 70 as part of the Floyd Hill Project. Ryan Spencer/The Aspen Times One of the largest road construction projects on the Interstate 70 mountain corridor will require five overnight closures this month. The Colorado Department of Transportation said in a news release that the I-70 Floyd Hill project will require full closures of westbound I-70 between exits 241 and 244 for bridge construction. The closures are planned between 9 p.m. and 5 a.m. every night from Sunday, May 10, to Thursday, May 14, according to the news release. If weather impacts the work, crews will shift the construction schedule and closures could occur at the same times nightly from Monday, May 18, to Wednesday, May 20. Located between Evergreen and Idaho Springs, Floyd Hill is an about eight-mile stretch of I-70 where the transportation department has undertaken a $900 million project aimed at improving safety and travel time reliability. During the closures, westbound I-70 traffic will be detoured onto U.S. Highway 6 at Exit 244 and will get back on I-70 at the Exit 241 on-ramp. The detour is expected to add less than 10 minutes to driver’s trips, according to the transportation department. Drivers should also anticipate intermittent traffic holds for rock blasting and rock scaling through Floyd Hill on Mondays through Thursdays about once an hour between 9 a.m. and 3 p.m. throughout the year. To sign up for text alerts about the I-70 Floyd Hill project, text “floydhill” to 21000. ---------------------- This Project is Located on I-70 From Mp 31.39 to Mp 37 Including Interchange Ramps at Exit 31 and 37. The Work Consists of a 2 Inch Hma Mill and Fill. The Project Also Includes Guardrail Replacement, Delineation, and Final Striping. It is estimated that the total cost of all items in the bid will be: (X) Between $5,000,000 and $20,000,000 This project is located in Region 3 in Mesa County. Project work consists of hot mix asphalt resurfacing and other improvements on I-70 from MP 31.39 - 37. Please contact Kaitlyn Clark at 970-683-6351 for all project related questions. Questions received from bidders along with CDOT responses will be posted on the CDOT web site listed below as they become available CODOT: 001 - Region 3 - I-70 Resurfacing *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Roads / Highways

$20,000,000.00

Public - State/Provincial

Paving, Site Work

136

6

2

6

Subscribe For Documents

118 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
13
Bidding Soon
168
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2026

August 10, 2026

Project location map

I-70, Fruita, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.