Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 6, 2026 at 8:00 PM
Updated May 15, 2026
Site work for a development in Woodland, California. Completed plans call for site work for a development.
The purpose of the project is to satisfy mitigation requirements imposed on the County by the California Department of Fish and Wildlife for a separate in-channel reconfiguration and levee rehabilitation project that the County completed on Lower Cache Creek in 2022 and 2024. This work is primarily grant-funded through a project partnership agreement between the County and the State of California Department of Water Resources. The scope of work includes site preparation (e.g., invasive species control and soil amendments), installation of native plantings and irrigation systems, and protection and documentation of plantings. The Contractor shall provide ongoing maintenance, monitoring, and reporting during the warranty period, including replacement of failed plantings as necessary to meet specified performance standards. Optional post-warranty maintenance and monitoring may be required to support long-term establishment of the restoration areas. A pre-mandatory bid conference is scheduled at the Cache Creek Nature Preserve in Woodland, California. After visiting the Cache Creek Nature Preserve site, attendees will depart together to the second project location. Please park in the designated parking area and meet at the wetland overlook adjacent to the parking lot. Participants will be guided to the restoration area. All questions regarding Specifications and interpretations or clarifications for this Initiation for Bid must be entered electronically Question Deadline 05/01/2026 at 2:00 PM PT *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All bids will be compared using the Opinion of Probable Cost (OPC) prepared by the AE of Record for the project. For the purposes of bonding, the OPC for the base bid work is in the range of $170,000 to $230,000. The OPC for Bid Alternative 1 (the additional four years of maintenance and monitoring) is in the range of $93,500 to $126,500.
Post-Bid
Conservation and Development
$230,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 14, 2026
June 15, 2026
Multiple Locations, Woodland, CA
Related To This Project
Woodland, CA
Bid Date: May 12 2026
Woodland, CA
Bid Date: May 14 2026
Woodland, CA
Bid Date: May 14 2026
Woodland, CA
Bid Date: May 19 2026
Woodland, CA
Bid Date: May 29 2026
Woodland, CA
Bid Date: Jun 11 2026
Woodland, CA
Bid Date: Mar 25 2026
Woodland, CA
--
Woodland, CA
Bid Date: Feb 19 2026
Woodland, CA
Bid Date: Mar 05 2026
Woodland, CA
Bid Date: Jul 31 2026
Woodland, CA
Bid Date: Jan 27 2026
Woodland, CA
--
Woodland, CA
Bid Date: Jan 29 2026
Woodland, CA
Bid Date: Dec 18 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
