Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 26, 2026 at 8:00 PM
Updated May 27, 2026
Remodeling of a clubhouse / community center in Evanston, Illinois. Completed plans call for the remodel of a clubhouse / community center.
This project consists of the kitchen remodel at the Levy Center. Interior remodeling of the existing 412 sf kitchen at levy senior center. provide all necessary Architectural, Electrical, HVAC and Plumbing work as noted. The work to be performed under this contract shall consist of the furnishing of all materials, equipment, supplies, labor and transportation, and performing all work as required to strictly conform to the provisions of the specifications, schedules and drawings, all of which are made a part herein, together with such detail drawings as may be furnished by the Owner from time to time during the prosecution of the work in amplification of said drawings and specifications. This project includes, but is not limited to the removal and replacement of existing restroom partitions, select plumbing fixtures, light fixtures, hand dryers, doors + frames, restroom wall material, and outdoor drinking fountain. It also includes the expansion of men and women's restrooms by shifting an existing wall as indicated on the drawings, and new polished concrete topping in men and women's restrooms. Plumbing and electrical scope is generally limited to the replacement of existing fixtures without increase in demand loads, and no changes to the existing HVAC system are anticipated. Substantial Completion Deadline: October 5, 2026 Final Completion Deadline: November 6, 2026 Please contact the Purchasing Department office at 847-866-2935 if you have any questions MBE (25%), WBE (25%)
Post-Bid
Clubhouse / Community Centers
$1,500,000.00
Public - City
Remodeling
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 12, 2026
July 20, 2026
300 Dodge Ave, Evanston, IL
Related To This Project
Evanston, IL
Bid Date: Apr 24 2026
Evanston, IL
Bid Date: Jun 16 2026
Evanston, IL
Bid Date: May 05 2026
Evanston, IL
Bid Date: Apr 27 2026
Evanston, IL
Bid Date: May 19 2026
Evanston, IL
Bid Date: May 18 2026
Evanston, IL
Bid Date: Jun 02 2026
Evanston, IL
Bid Date: Jun 23 2026
Evanston, IL
Bid Date: May 19 2026
Evanston, IL
Bid Date: May 12 2026
Evanston, IL
Bid Date: Apr 10 2026
Evanston, IL
Bid Date: Apr 07 2026
Evanston, IL
Bid Date: Apr 14 2026
Evanston, IL
Bid Date: Apr 14 2026
Evanston, IL
Bid Date: Apr 07 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
