BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 30, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of an elderly care / assisted living facility in Appleton, Wisconsin. Completed plans call for the renovation of a elderly care / assisted living facility.

Outagamie County, Wisconsin is seeking sealed bids for elevator modernizations at Brewster Village. Bid specifications are available for download from the County's website or by contacting the provided procurement coordinator. Bids must be received by the specified date and time to be considered; late, faxed, or emailed bids will not be accepted. Submitted bids must remain firm for sixty days and may not be withdrawn, except as allowed under applicable statutes, county ordinance, and administrative rules. The project includes a full modernization of two (2) hydraulic passenger elevatorsserving two levelsin a skilled nursing facility. These elevators are criticalto residenttransport, bed movement and emergency operations and must remain compliant with healthcare occupancy standards. In addition to local codes, the project must be executed in compliance with: Wisconsin Administrative Code SPS318 ASME A17.1 Safety Code for Elevators ADA Requirements Wisconsin DHS Requirements for Skilled Nursing Facilities Healthcare occupancy transport requirements Nurse and bed transport reliability Fire alarm interface for recall Emergency power / battery lowering Reference Exhibit A for the Project Specifications on this project, dated April 13, 2026. The contractor shall provide all materials, labor and equipment to complete the upgrades on two (2) elevators as outlined in Exhibit A. Reference Exhibit B for the building layout with the two elevators highlighted, one in the Atrium neighborhood and one in the Heritage neighborhood Project shall include the following completed as a turnkey solution to include all labor and any additional parts or materials required for the upgrade requested even if not specifically called out. The upgrades shall be the same for both elevators. Plan Submittal / Approval - Submit plans to DHS for OPRI approval o Brewster Village will pay any fee(s) to DHS for this Hydraulic System Upgrade Requirements - New hydraulic power units (pump, motor, tank) - New electronic control valves - New shutoff valves and piping - Oil containment (per Wisconsin code) - Jack inspection and re-sealing or liner if required - New silencers and pressure relief components Electrical & Controls Upgrade Requirements - Microprocessor-based controller - Solid-state motor starters or VFD - New traveling cables -New wiring, relays and safety circuits - Emergency battery lowering system -Phase I and Phase II firefighter recall - Controller must be non-proprietary Door Equipment Upgrade Requirements - New door operators - New door restrictors - Light curtains or door safety edges -Door gibs and tracks as required Fixtures & ADA Upgrade Requirements - New car operating panels (COPs) - New hall stations - Braille and tactile buttons - New elevator key boxes - Floor indicators and lanterns - Emergency two-way communication system compliant with Wisconsin SPS 318, cellular solution is required Cab & Lighting Upgrade Requirements - LED lighting panels - Emergency cab lighting - Ventilation upgrades o Minimum airflow: 100 CFM o Maximum noise: 1.5 sones o Fan shall operate automatically with cab lighting o Provide durable, cleanable intake/exhaust grilles o Fan shall be rated for continuous duty o Provide vibration isolation to minimize noise o Coordinate with cab ceiling design - New cab interiors - HPL laminate impact resistant paneling - Stainless steel trim - Stainless steel railing - Flooring to be replaced with LVT (interior panel and flooring style to be selected by Brewster Village) Testing & Acceptance Requirements -Full ASME A17.1 acceptance testing - 125% load test - Fire service testing - Wisconsin State Elevator Inspection (Contractor files all paperwork and pays fee) - Final Permit to Operate (Contractor files all paperwork and pays fee)

Post-Bid

Elderly Care / Assisted Living

$800,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
100
Bidding Soon
1,247
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2026

May 29, 2026

Project location map

3300 W Brewster St, Appleton, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.