Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 6, 2026 at 8:00 PM
Updated May 16, 2026
Demolition, site work, renovation and addition to a medical facility in Timmins, Ontario. Completed plans call for the addition of a 19,120-square-foot, one-story above grade, 24-room medical facility; for the demolition of a medical facility; for the renovation of a 9,427-square-foot medical facility; and for site work for a medical facility.
TADH Emergency Department Expansion and Renovation – Request for Prequalification for General Contractors Timmins and District Hospital (TADH) is a 229-bed, fully accredited (Accreditation Canada) teaching and referral hospital, supported by a dedicated team of approximately 1,400 staff and more than 288 credentialed physicians—including 88 local physicians and over 200 visiting locums. Together, they serve as a critical hub for more than 110,000 residents across Northeastern Ontario. TADH’s catchment area includes urban, rural, and remote communities spanning the districts of Algoma, Cochrane, Kenora, Sudbury, and Timiskaming, as well as the James and Hudson Bay coasts. The hospital delivers a full continuum of care from birth to end of life and is the only hospital in the district providing both general and advanced specialized surgical services. TADH offers a comprehensive range of programs and services, including emergency, medical, and surgical care; maternal, newborn, and pediatric services; and mental health and addiction supports for children, youth, and adults. The hospital also provides rehabilitation and complex continuing care, oncology, palliative and hospice services, as well as chronic disease management through dialysis, kidney care, and diabetes education. Diagnostic imaging, laboratory services, and a range of visiting specialty clinics further enhance access to care close to home. The Emergency Department Expansion and Renovation will deliver a new, purpose-built ED through a vertical expansion above the existing Dialysis wing, capped by a dedicated mechanical penthouse, along with targeted renovations to the current ED. In total, approximately 19,120ft² (1,776 m²) of new clinical space will be added, and 9,427 ft² (875 m²) of existing space renovated. The expanded ED will include 24 patientcare bays—comprising two Trauma rooms and three Isolation rooms—a secure Mental Health Emergency Stabilization Unit (MHESU) with four seclusion rooms, and a four-bay enclosed ambulance garage. A reconfigured entry sequence and ambulance enclosure will clearly separate first-responder traffic from walk-in and ambulatory arrivals, improving safety, wayfinding, and patient flow from curb to care. Closing Friday June 12, 2026 at 2:00 p.m. All information can be found at www. merx.com Question Deadline 2026/05/20 02:00:00 PM EDT Questions are submitted online Yes Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
GC Bidding
Medical
$60,000,000.00
Public - State/Provincial
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 12, 2026
October 1, 2026
700 Ross Ave E, Timmins, ON
Related To This Project
Timmins, ON
Bid Date: May 07 2026
Timmins, ON
Bid Date: May 08 2026
Timmins, ON
Bid Date: May 25 2026
Timmins, ON
Bid Date: Jun 01 2026
Timmins, ON
Bid Date: Jun 02 2026
Timmins, ON
Bid Date: Jun 10 2026
Timmins, ON
Bid Date: Mar 25 2026
Timmins, ON
Bid Date: Mar 26 2026
Timmins, ON
Bid Date: Mar 06 2026
Timmins, ON
Bid Date: Mar 18 2026
Timmins, ON
Bid Date: Apr 01 2026
Timmins, ON
Bid Date: Mar 19 2026
Timmins, ON
Bid Date: Mar 20 2026
Timmins, ON
Bid Date: Mar 20 2026
Timmins, ON
Bid Date: Mar 06 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
