BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 16, 2026

Site work, paving and new construction of a power facility in Round Lake, Illinois. Completed plans call civil work for a power facility.

The project consists of the construction of two (2) full-size soccer fields, a parking lot, and a walking path connection to the existing baseball fields, including all associated grading, sod installation, and establishment. Project Parameters o Soccer Fields: Two (2) fields approximately 360 ft x 225 ft each o Parking Lot: Approximately 60 spaces o Walking Path: 8-10 ft wide connection Contractors shall base bids on these parameters. Scope of Work The Contractor shall provide all labor, materials, equipment, and supervision necessary to complete the following: A. Earthwork and Field Preparation o Removal of existing parking lot, baseball field areas, and associated materials within proposed soccer field footprint o Excavation of approximately 8-12 inches of existing material across both field areas o Proper disposal or on-site reuse of excavated material as approved by Owner o Rough grading to establish subgrade B. Soccer Fields o Fine grading to achieve proper drainage and a crowned (center high point) field profile o Fields shall include a center crown to promote positive drainage toward sidelines. The finished surface shall be constructed with an approximate 1%-1.5% slope from the centerline to each sideline unless otherwise approved by the Owner o Placement of minimum 4 inches of clean, debris-free topsoil suitable for athletic turf, free of rocks, roots, construction debris, and contaminants o Installation of athletic-grade sod C. Sod Maintenance and Grow-In Period o Contractor shall be responsible for watering, and maintaining all newly installed sod for a minimum of 60 days or until fully rooted and accepted by the Owner o Maintain consistent moisture to ensure proper rooting and turf health o Repair or replace any areas of sod that do not properly establish o Final acceptance will be based on full, healthy, and uniform turf coverage suitable for play D. Parking Lot (Gravel) o Utilize existing on-site gravel materials where suitable o Re-grading and shaping parking area o Placement and compaction of additional aggregate as needed o Final grading for proper drainage o Remove, salvage, and reinstall existing parking bumpers/wheel stops o Replace any damaged or missing parking bumpers with new units of similar type and size, included in base bid E. Walking Path (Gravel) o Construction of gravel path connecting the parking lot to existing baseball fields o Utilize existing on-site materials where feasible o Final grading and compaction for stable walking surface F. General Site Work o Erosion control o Site restoration o Coordination of all work components o Minimum 60-day watering and maintenance period o Replacement of failed sod

GC Bidding

Hydroelectric Power Generation

$3,000,000.00

Public - City

New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
667
Active Projects
328
Bidding Soon
3,914
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2026

July 1, 2026

Project location map

To be Determined, Round Lake, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.