Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 11, 2026 at 8:00 PM
Updated May 15, 2026
Site work and paving for a road / highway in Brighton, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Reference Number 0000421019 Source ID PU.AG.USA.1268.C13169926 Piggyback Contract No Question Deadline 04/28/2026 at 10:00 AM MT Questions are submitted online No The Brighton Urban Renewal Authority (BURA) seeks the Bid of qualified Respondents to provide complete construction services of certain areas within the Highway 7 and Highway 85 intersection located in Brighton, Colorado. Substantial coordination with Colorado Department of Transportation (CDOT) is required to successfully complete the project. BURA, by and through the City of Brighton Division of Procurement & Contracts is accepting bids from qualified Respondents to furnish all labor, equipment, supplies, and materials as necessary for Construction of Hwy 7 and Hwy 85 Intersection Improvements stated herein this Invitation to Bid. General Requirements - Bid Deposit Required - Contractors License Required - FOB Destination - Installation Required - Insurance Required PROJECT SUMMARY: Located approximately within the intersection of Colorado State Highway 7 and US Highway 85 Brighton, Colorado, 80601, the project area includes approximately 5.5 acres including two roundabouts located along Colorado State Highway 7 (SH 7) and four (4) segments of landscape located north and south of the SH 7/US Highway 85 (US 85) roundabout interchange. All landscape areas are within the Colorado Department of Transportation (CDOT) right-of-way. Landscape beds in all of the segments include two-tiered walls to reduce landscape slopes. Native seeding and wildflowers along slopes will act as both a soil stabilizer and showcase lower water use. Artful lighting underneath the US 85 bridge adds a layer of depth to the design and will significantly enhance the visual aspects of the overall scope of work. The final scope of work is the installation of a large gateway sign structure which shall be illuminated. Said structure will be located within the western roundabout. The existing CDOT signage shall remain in place.
Bid Results
Roads / Highways
$2,556,402.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 7, 2026
July 6, 2026
Hwy 7 and Hwy 85, Brighton, CO
Related To This Project
Brighton, CO
Bid Date: May 21 2026
Brighton, CO
Bid Date: May 20 2026
Brighton, CO
Bid Date: May 15 2026
Brighton, CO
Bid Date: Apr 21 2026
Brighton, CO
Bid Date: May 29 2026
Brighton, CO
Bid Date: Jun 03 2026
Brighton, CO
Bid Date: Mar 24 2026
Brighton, CO
--
Brighton, CO
Bid Date: Mar 18 2026
Brighton, CO
Bid Date: Mar 19 2026
Brighton, CO
Bid Date: Mar 23 2026
Brighton, CO
Bid Date: Mar 04 2026
Brighton, CO
Bid Date: Mar 27 2026
Brighton, CO
Bid Date: Feb 27 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
