Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 13, 2026 at 8:00 PM
Updated May 16, 2026
Renovation of an educational facility in Grand Junction, Colorado. Completed plans call for the renovation of a 10,941-square-foot, three-story above grade educational facility.
Reference Number 0000421052 Source ID PU.AG.USA.2367.C20767826 Piggyback Contract No Question Deadline 04/22/2026 at 12:00 PM MT Questions are submitted online Yes POINT OF CONTACT/CLARIFICATION Name: Breanne Meier Agency: Colorado Mesa University Email Address: bmeier@coloradomesa.edu Phone: 970-248-1417 Opened in 2014, Escalante Hall is a three-story, 76,000-square-foot facility at Colorado Mesa University that houses the Department of Languages, Literature, and Mass Communication. The building blends traditional classrooms with modern technology to foster interdisciplinary learning and is integrated into the university's sustainable geothermal Geo-Grid for temperature control. The State of Colorado, Colorado Mesa University (CMU), is soliciting bids from qualified contractors to replace the second-floor geo pipe in Escalante Hall. General Requirements - Bid Deposit Required - Certification/Training - Contractors License Required - FOB Destination - Insurance Required - License Required - Prevailing Wage Required - Training Required Award Requirements - All or None Award Bid Bond 5 % Scope of Services All existing mechanical piping indicated on the provided plans shall be removed and replaced with Niron PP-RCT SDR-11 piping. This includes all mechanical piping on the 2nd and 3rd levels of Escalante Hall, including the heat pump loop mains, supply, and return piping serving approximately 52 heat pumps Replacement piping shall match the size of the existing pipes being removed. New isolation valves shall be provided at all branch take-offs, as well as on the heat pump loop mains, to ensure each level can be fully isolated. The contractor shall carefully remove, protect, and reinstall the existing valve packages and circulator pumps at each heat pump, providing all necessary manufacturer-approved transition fittings to connect the new PP-RCT piping to the existing metallic components. Because PP-RCT plastic piping behaves differently than metallic pipe, the contractor must provide new piping supports, hangers, and expansion compensation devices spaced strictly per the Niron manufacturer's installation guidelines.
Post-Bid
Educational
$437,103.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
