BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 24, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Alexander, Arkansas. Conceptual plans call for site work for a water / sewer project.

The Saline County Sewer and Water Works Public Facility Board (SCPFB) is seeking to acquire the services of a professional engineering firm to provide services for making improvements to its wastewater treatment plant. The proposed scope of work includes all regulatory and engineering disciplines associated with expanding the existing wastewater treatment plant from 0.20 MGD to 0.40 MGD design flow.

Conceptual

Water / Sewer

$1,500,000.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
38
Bidding Soon
526
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2027

Project location map

Multiple Locations, Alexander, AR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.