BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 16, 2026

Site work, paving and outdoor lighting for a mixed-use development in Carrollwood, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.

The improvements under this contract include milling and resurfacing, minor widening, pedestrian connectivity and safety, access management, drainage, lighting, pavement marking, signage, and signalization. These urban corridor, roadway, and pedestrian safety enhancements occur along State Road 580 / West Busch Boulevard and Gunn Highway from North Dale Mabry Highway to North Nebraska Avenue in Hillsborough County. Total Roadway Length: 3.594 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 3.594 Miles Question Deadline 05/13/2026 at 5:00 PM ET, Direct all questions to the Department by posting them to the Department's website. Questions posted to this site before 5:00 P.M. (EST) on the tenth calendar day prior to the bid opening, will be responded to by the Department. For questions posted after this deadline, an answer cannot be assured. FDOT - 014 - Resurfacing / Drainage / Traffic Signal

GC Bidding

Roads / Highways

$14,752,760.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

321

4

3

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
320
Active Projects
131
Bidding Soon
1,880
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2026

July 20, 2026

Project location map

Gunn Hwy & W Busch Blvd, Carrollwood, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.