BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 24, 2026 at 8:00 PM

Updated May 20, 2026

Site work and new construction of a mixed-use development in Toronto, Ontario. Design plans call for the construction of a 79,596-square-foot, three-story above grade recreation facility; and for site work for a playground / park / athletic field.

Construction of a 3-storey Toronto Tempo primary practice/training facility planned next to Exhibition Place and the Coca-Cola Coliseum. The facility will be a purpose-built practice facility for the WNBA Toronto Tempo just east of Exhibition Place. Within walking distance, the facility's 701 Fleet Street location, just outside the Princes' Gates, would be delivered through a partnership with the City of Toronto on City-owned land. In addition to serving as the team's dedicated training base, the project is structured to provide significant community access as a year-round public recreation hub with courts, programming, and new park space. The project would repurpose an underused overflow parking lot on the block bordered by Lake Shore Boulevard West, Strachan Avenue, Fleet Street, and Fort York Boulevard. The facility might include the following: -2 WNBA regulation courts; -First-of-its-kind locker room featuring individual showers and changing areas for each player, salon and vanity spaces, a mother's room, and elevated interiors; -Dedicated sports medicine, sports performance, and recovery areas; including treatment and rehab areas, strength and conditioning space, hydrotherapy pools, a sauna, a wellness consult room, and advanced recovery areas; -Expansive player lounges, fuel bars and a dining area to foster team connection, and nutritional health; -Dedicated spaces for team development, including a fully-equipped theatre for film study and conference rooms; -Collaborative Basketball Operations and Business office spaces, combining the team with the business in one state-of-the art facility. TIMELINE: Designs are underway. Owner is awaiting rezoning approvals from the city of Toronto. Pending approvals, construction is anticipated to begin fall 2026 with an opening in 2028. Further update late summer 2026. *Client: Tempo Basketball Club Scotia Plaza, Suite 2700, 40 King Street West, Toronto, Ontario M5H 3Y2.

Design

Amusement and Recreation

$100,000,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
872
Active Projects
470
Bidding Soon
5,357
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2026

Project location map

701 Fleet St, Toronto, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.