BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2026 at 8:00 PM

Updated May 19, 2026

Renovation of a water / sewer project in Calexico, California. Completed plans call for the renovation of a water / sewer project; and water / sewer project.

The City of Calexico is requesting proposals from qualified engineering professionals to provide engineering design services for a Chlorine Conversion Project. The project involves converting the disinfection systems at the City's Water Treatment Plant (WTP) and Eastside Water Reservoir (EWR) from a gaseous chlorine system to a 12.5% bulk sodium hypochlorite disinfection system. The WTP has a design capacity of 14 Million Gallons per Day (MGD) and the EWR has a design capacity of 6 MGD. The conversion is prompted by safety concerns regarding the use of toxic chlorine gas in facilities located near residential areas, schools, and the Calexico International Border. The scope of work includes but is not limited to: Task No. 1 - Project Management, QA/QC, and Accounting Task No. 2 - Project Setup, Site Visit and Preliminary Design Meeting Task No. 3 - Draft Feasibility/ Preliminary Design Report and Final Feasibility Study/Preliminary Design Report for Water Treatment Plant and Eastside Water Reservoir Task No. 4 - Plans, Specifications and Estimate for Water Treatment Plant and Eastside Water Reservoir a. 50% design submittal b. 90% design submittal c. 100% design submittal Task No. 5 - Final Plans, Specifications and Estimate for Water Treatment Plant and Eastside Water Reservoir Task No. 6 - Regulatory Agencies, Environmental and Permitting a. CEQA, NPDES Construction Permit b. State Water Resources Control Board, Division of Drinking Water a. Monthly/Quarterly updates c. Department of Toxic Substance Control d. Imperial County Air Pollution Control District e. City of Calexico Development Services Department f. City of Calexico Fire Department g. Other Task No. 7 - Public Meetings, Outreach, and/or Presentations to City Council a. Preparation of agendas, minutes, agenda staff reports, etc. b. Approximately five (5) meetings Task No. 8 - Additional Field Survey Task No. 9 - Bidding Support and Construction Phase Services a. Addendum for design related issues b. Pre-bid meeting agenda and minutes c. RFI responses and submittal review comments d. Assist in change orders during construction e. As-built record drawings Task No. 10 - City of Calexico Water Treatment Plant and Eastside Water Reservoir Operation Manual Plan Update Pre-submittal procedural or technical inquires may be directed to Jesus Villegas, Public Works Director/City Engineer via email at jvillegas@calexico.ca.gov.

Post-Bid

Water / Sewer

$1,500,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
25
Bidding Soon
166
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2026

June 29, 2026

Project location map

Multiple locations, Calexico, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.