Site work and renovation of a mixed-use development in Edmond, Oklahoma. Completed plans call for the renovation of a educational facility; and for site work for a water / sewer project.

The intent of the following is to describe the Scope of Work included in each bid package. The bid shall include all the requirements in the specification sections listed unless specifically excluded below. There are three categories of bid packages--Labor and Material (L & M), Material only (M), and Labor and Equipment (L & E). (1) Labor and Material Bid Packages (L & M): Each separate package shall include all labor, materials, equipment, services, and incidentals required for a complete installation. The bid shall also include all General Condition items relative to each Scope of Work. Successful Labor Bid Package bidders must provide General Liability, Auto, and Workers' Compensation with a Certificate listing Additional Insured and Waiver of Subrogation in favor of the Owner, Architect, Construction Manager, and Funding Entity. (2) Material Only Bid Packages (M): Each separate package shall include all labor, materials, services, and incidentals required for complete fabrication, manufacture, and delivery to the project site of the materials included in the designated specification sections and drawings. (3) Labor and Equipment Bid Packages (L): Each separate proposal shall include all required labor and equipment to incorporate into the project specifically designated materials furnished by other bid packages. Successful Labor Bid Package bidders must provide General Liability, Auto, and Workers' Compensation with a Certificate listing Additional Insured and Waiver of Subrogation in favor of the Owner, Architect, Construction Manager, and Funding Entity. Project Location 901 Wayne Street - Edmond, OK 73034 215 W. Danforth Road - Edmond, OK 73003 Bid Bond: If a bid exceeds $50,000, a cashier's check, a certified check or surety bid bond in the amount of five percent (5%) of the total bid shall accompany the sealed bid of each bidder, designating the Edmond Public Schools and Dowell-Pontikos Construction as dual obligees. Security checks will be returned to all but the three lowest bidders after the bid opening. The three lowest bid securities will be retained as provided in the Instructions to Bidders. Bids received more than ninety-six (96) hours, excluding Saturday, Sundays and holidays, before the time set for opening of bids, as well as bids received after the time set for opening bids, will not be considered and will be returned unopened. The Owner/Construction Manager reserve the right to reject any or all bids and to waive all formalities or minor irregularities. The time period within which a Subcontract Agreement will be executed following award to the successful bidder is ten (10) days. Bidder must agree to commence work on a date to be specified in a written Notice to Proceed and the supplementary conditions and to achieve substantial and final completion in accordance with the Construction Manager's schedule, as revised from time to time. Bidder acknowledges and agrees that the actual damages to be suffered by Construction Manager in the event of delays is difficult, if not impossible, to determine with certainty. Therefore, Bidder agrees to pay liquidated damages in the amount of Five Hundred Dollars ($500) for each consecutive calendar day beyond the date set forth for substantial completion in the Construction Manager's schedule. The Bidder also agrees to fully complete the punch list within thirty (30) consecutive calendar days after substantial completion. Bidder agrees to pay liquidated damages in the amount of Five Hundred Dollars ($500.00) for each consecutive calendar day beyond the date set forth for final completion. Bidder agrees that the daily rates of liquidated damages set forth herein represent reasonable estimates of the actual damages that could be suffered as a result of delays, and do not constitute a penalty. Schedule of completion is included in bid documents. Question Deadline 04/24/2026 Every request for such interpretation should be in writing, addressed to the attention of: Jon Dowell, Dowell/Pontikos Construction, L.L.C. , PO Box 890118 Oklahoma City, OK 73189, e-mail jon@dowellpontikos.com,

Post-Bid

Educational

$250,000.00

Public - City

Renovation, Site Work

10

12

7

1

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
100
Bidding Soon
1,096
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2026

June 2, 2026

Project location map

Multiple Locations, Edmond, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.