BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 7, 2026 at 8:00 PM

Updated May 16, 2026

Renovation of a swimming pool in Joliette, Quebec. Completed plans call for the renovation of a swimming pool.

Reference number: 20139445 Deadline for receipt of complaints 2026-05-05 There is provision for a tendering process for each tender No Electronic tender submission accepted Yes, via SEAO, with a document Date of opening of tenders 2026-05-19 09:15 Quebec Legal Time Estimated contract price range 736 000 $ à 6 943 899 $ Expected duration of the contract without options (in months) 26 Through this notice, the Cegep de Lanaudiere is requesting bids for work to repair the aquatic sports facilities of the Joliette component located at 20, rue Saint-Charles-Borromee Sud, Joliette, J6E 4T1, whose documents are available on this site. The aquatic sports facilities of the constituent of Joliette wish to benefit from a wind of freshness in order to optimize the functionality of the spaces, to ensure their compliance with standards and to update them to the taste of the day. The work will be carried out in two main phases, spread over the next two summer periods. All of the two phases of work include, among other things: o Integration of a bathroom designed to meet the needs of people with reduced mobility o Repair of concrete around the pool (cracks, etc.) and optimization of drainage/flow slopes in the locker rooms o Replacement of the partitions for toilets, showers, and cabins as well as the replacement of lockers o Replacement and addition of plumbing components (drains, showers, sinks, toilets, etc.) o Complete painting of the pool area and addition of signage in accordance with current standards o Replacement of the floor covering in the locker rooms, access corridors, and on part of the pool oReplacement of the lighting in the locker rooms and the pool oSwinging of the ventilation units Start of Phase 1 works: 29 June 2026; Completion of Phase 1: 20 August 2026 Start of Phase 2 works: 28 June 2027; Completion of Phase 2: 20 August 2027; Unconditional acceptance of the works (entire project): 20 August 2027. A non-compulsory site visit is scheduled for 27 April 2026 at 08:30. The meeting point for this visit is the Joliette Constituent's security post, located at 20 Rue Saint-Charles-Borromee Sud, Joliette, J6E 4T1. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Swimming Pools

$6,943,899.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
630
Active Projects
326
Bidding Soon
2,611
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2026

June 29, 2026

Project location map

20 Rue Saint-Charles-Borromée S, Joliette, QC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.