BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2026 at 8:00 PM

Updated May 20, 2026

Site work, paving and renovation of an educational facility in Midlothian, Texas. Design plans call for the renovation of a educational facility; for site work for a educational facility; and for paving for a educational facility.

Address building design and functionality, including the split-level floors in the cafeteria, entry to the school, and the stairs in the choir room. Reconfigure the area adjacent to the stage to add ensemble spaces for band and choir. This would make the size of these spaces similar to the other MISD middle schools. Address finishes in the cafeteria and entry and purchase and install new theater stage lighting & sound system Replace roofing for the building (10-15 year restore, not a complete tear-off) and replace leaking skylights. Replace electrical switchgear to meet current electrical safety standards and provide capacity for future facility demands. Remodel restroom finishes and fixtures to address ADA accessibility and maintain hygiene standards. Replace fire alarm system. Install LED lighting with new controls (occupancy sensors, daylight harvesting) to reduce energy consumption and update lighting in learning environments. Replace worn, outdated, or non-compliant flooring in instructional and common areas. Note: Replacing VCT with LVT will standardize flooring selection for all schools and reduce maintenance costs. LVT is resistant to scratches, dents, and moisture and requires sweeping and occasional mopping. VCT is porous and requires regular polishing, stripping and resealing. Improve sidewalks and parking lots with necessary paving and grading to ensure safety and accessibility. This project is funded by the district’s November 2025 voter approved bond. As of May 18, 2026, a construction manager is in place, and preliminary design work is underway. Construction is scheduled to start in Spring 2027, with Substantial Completion expected in Summer 2029.

Design

Educational

$128,525,000.00

Public - City

Paving, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
470
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2027

Project location map

700 George Hopper Rd, Midlothian, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.