BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2026 at 8:00 PM

Updated May 15, 2026

Site work and paving for a road / highway in Prineville, Oregon. Completed plans call civil work for a road / highway.

The work contemplated generally consists of furnishing all labor, equipment, supplies and materials to complete the Street Rehabilitation Project as described in the provided construction drawings. The selected contractor will be required to enter into a construction contract with the City of Prineville. Question Deadline 05/08/2026 at 2:00 PM PT All questions regarding this project solicitation shall be directed to Justin Severance, Street Superintendent, in writing to jseverance@cityofprineville.com. The City of Prineville public works department is seeking services related to the rehabilitation of approximately 371,123 square feet of city streets. The following will be milled at 2 inches. Inlaid two inches. Unless specified below. Tack coat to be applied. Contractor will supply Traffic control. NE Alabama from Mariposa to End 226 tons approx. asphalt. "18,050 square feet approx." There is 1 water valve can and 1 manhole lid. City will have water valve can lose for contractor to raise to grade. Manholes will need to be ground around. If needed, riser rings will be supplied by the city. Tack coat will be supplied by contractor. Traffic control will be required by contractor. NE Baily Way from Mariposa to End 226 tons approx. asphalt. "18,050 square feet approx." There is 1 water valve can and 1 manhole lid. City will have water valve cans loose for contractor to raise to grade. Manholes will need to be ground around. If needed, riser rings will be supplied by the city. Tack coat will be supplied by contractor. Traffic control will be required by contractor. NE Clearview from Mariposa to End 226 tons approx. asphalt. "18,050 square feet approx." There is one water valve can and 1 manhole lid. City will have water valve cans loose for contractor to raise to grade. Manhole will need to be ground around. If needed, riser rings will be supplied by the city. Tack coat will be supplied by contractor. Traffic control we be required by contractor. NE Lisa Court from Mariposa to End 213 tons approx. asphalt. "17,040 square feet approx." There is 2 water valve cans and 1 manhole lid. Manhole lid will need to be ground around. If needed, riser rings will be supplied by the city. Tack coat will be supplied by contractor. Traffic control required by contractor. NE Deedie Court from Mariposa to end 213 tons approx. asphalt "17,308 square feet approx." There are 2 water valve cans and 1 manhole lid. Manholes will need to be ground around. Tack coat will be supplied by contractor. Traffic control required by contractor. NE Larry Court from Mariposa to End 198 ton approx. "15,879 square feet approx." There is 1 water valve can and 2 manhole lids. City will have water valve can lose for contractor to raise to grade. Manholes will need to be ground around. If needed, riser rings will be supplied by the city. Tack coat will be supplied by contractor. Traffic control will be required by contractor. NE Mariposa Ave from Clearview to concrete crosswalk 783 tons approx. asphalt. "62,580 square feet approx." There are 11 water valves cans and 5 manhole lids. City will have water valve can loose for contractor to raise to grade. Manholes will need ground around. If needed riser ring rings will be supplied by the city. Tack coat will be supplied by contractor. Traffic control will be required by contractor. NE Pippen Lane from Mariposa to End 302 tons approx. asphalt. "24,145 square feet approx." There are 7 water valve cans and 5 manhole lids. City will have valve cans loose for contractor to raise to grade. Manholes will need ground around. Tack coat will be supplied by contractor. Traffic control will be required by contractor. NE Brookstone Drive 225 tons approx. asphalt. "18,000 square feet approx." There are 3 water valve cans and 3 manhole lids. City will have valve cans loose for contractor to raise to grade. Manholes will need to ground around. Tack coat will be supplied by contractor. Traffic control will be required by contractor. NE Robin (There is no Grind just overlay) 556 tons approx. asphalt. "44,500 square feet approx." There are 6 water valve cans and 4 manholes. Tack coat will be supplied by contractor. Traffic control will be required by contractor. North Main from NE 3rdto NW 9th St 1,275 tons approx. asphalt. "101,970 square feet approx." There are 19 water valves and 2 manholes. City will have valve cans loose for contactor to raise to grade. Manholes will need to be ground around. Tack coat will be supplied by contractor. Traffic control will be required by contractor. NE Jordan LN from Ochoco Ave to Hudspeth RD 326 tons approx. asphalt "15,551 square feet approx." There are 2 manhole lids. Manholes will need to be ground around. There are 3 water valve cans. City will have water valve cans loose for contractor to raise. Tack coat will be supplied by contractor. Traffic control will be required by contractor. "10,296 square feet approx." will have two 2-inch lifts. 5,255 square feet will have 2-inch grind and inlay.

GC Bidding

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
8
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2026

July 20, 2026

Project location map

Multiple Locations, Prineville, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.