Published May 14, 2026 at 8:00 PM

Updated May 15, 2026

Site work for a civil project in San Francisco, California. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

The City and County of San Francisco, acting by and through the San Francisco Public Utilities Commission (SFPUC), is soliciting Proposals from qualified firms to provide Construction Management / General Contractor services fo - Moccasin Dam and Reservoir Long-Term Improvements Project using the Construction Manager / General Contractor project delivery method. The Project is an integral part of the Hetch Hetchy Water and Power water supply system (Hetch Hetchy system). The main purpose of the Hetch Hetchy system is to convey raw drinking water from Hetch Hetchy Reservoir to the San Francisco Bay Area. This conveyance is achieved through a combination of reservoirs, pipelines, and tunnels. Moccasin Reservoir is located directly downstream of the last of the three powerhouses of the Hetch Hetchy system, directly over Moccasin Creek., a severe storm caused a flood surge and damaged various infrastructure. Each Applicant must have a Class A California Contractors license which is current, active, and in good standing with the California Contractors State License Board (CSLB), Written questions regarding the RFQ&P shall be directed to qbd@sfwater.org no later than 4:00 P.M. on Monday, June 8, 2026. Respondents must submit their required written submittals (Application and Proposal) via upload in response to the RFQ&P no later than 2:00 P.M. on Wednesday, June 17, 2026. The Project is an integral part of the Hetch Hetchy Water and Power water supply system (Hetch Hetchy system). The main purpose of the Hetch Hetchy system is to convey raw drinking water from Hetch Hetchy Reservoir to the San Francisco Bay Area. This conveyance is achieved through a combination of reservoirs, pipelines, and tunnels. Moccasin Reservoir is located directly downstream of the last of the three powerhouses of the Hetch Hetchy system, directly over Moccasin Creek. On March 22, 2018, a severe storm caused a flood surge and damaged various infrastructure. Each Applicant must have a Class “A” California Contractor’s license which is current, active, and in good standing with the California Contractors State License Board (CSLB), on the date and time the Qualification Application is submitted and must submit this Qualification Application with all portions completed, including required attachments. The Applicant must (1) retain trade subcontractors for pre-construction work and construction work who have a California Contractor’s license which is current, active, matches with the Work being performed, and is in good standing with the CSLB, on the date and time the Work is performed and (2) have a Qualifying Individual on staff who has a current active California Contractor’s License to manage the required construction work. Due to the unique complexities of the design and construction required for this Project, the City has determined that the Project requires specialized expertise and skill, which should be procured with an alternate delivery method to traditional design-bid-build. The City has selected the Construction Manager / General Contractor project delivery method (“CM/GC Delivery”) in accordance with San Francisco Administrative Code Section 6.68(b)(3) CM/GC Team Best Value Procurement. The Proposer is the lead entity responding to this RFQ&P. A Proposer may be either an individual Prime Proposer or a Joint Venture (JV). The selected Proposer is referred to herein as the Contractor. The term CM/GC as used herein, when not referring to the delivery method, can apply to either a Proposer or the Contractor, depending on the context. The CM/GC Team is comprised of (a) the CM/GC and (b) CM/GC’s two Core Trade Subcontractors. The selected CM/GC Team will engage in pre-construction services to provide expertise to the City-led design team composed of SFPUC staff and design consultants (collectively hereinafter referred to as “A/E Team”) to complete the design process and, if authorized, perform construction services to deliver the Project, meeting SFPUC’s quality goals, schedule, and budget. The Local Business Enterprise (“LBE”) participation requirement for this Project is 12% of the Contract Sum.

GC Bidding

Bridges / Tunnels

$55,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
384
Active Projects
165
Bidding Soon
1,985
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2026

October 19, 2026

Project location map

To Be Determined, San Francisco, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.