Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 11, 2026 at 8:00 PM
Updated May 14, 2026
Site work and new construction of an educational facility in New York, New York. Completed plans call for the construction of a educational facility.
Baruch College - Newman Vertical Campus Fire Alarm Closet Construction. Service-Disabled Veteran-Owned Business (SDVOB) goal: 6.00%. Minority / Women Business Enterprise contracting goals (MWBE): Total MWBE Goals: 30.00%. Question Deadline 04/29/2026 at 11:59 PM ET All questions pertaining to this procurement must be submitted in writing via email to CUNY.Builds@CUNY.edu (MWBE) participation goal of 30% The general contractor must provide construction services in accordance with the Architectural and Engineering Design Documents attached herein as Exhibit 2 (Drawings and Specifications). All work shall be in accordance with all applicable Federal, State, and New York City regulations. The general contractor shall provide all materials and labor in the performance of the Scope of Work which shall consist of, but is not limited to the following: A. Selective Building Demolition: 1. Remove existing panel disconnects, wire trough, panel 60A Square D disconnect, and pull-box as indicated on the design drawings and specifications (Exhibit 2). B. Interior Construction: 1. Construct a fire-rated, metal-framed wall and ceiling assemblies as indicated on the design drawings and specifications (Exhibit 2). 2. Install a Hollow Metal, painted, fire-rated door and frame as indicated on the design drawings and specifications (Exhibit 2). 3. Make any repairs to existing wall and/or ceiling damaged while constructing the new wall and ceiling assemblies. C. Interior Finishes: 1. Paint newly constructed walls and ceilings to match the existing walls and ceilings. 2. Patch and paint any existing wall and/or ceiling surfaces damaged in the process of constructing the new wall and ceiling assemblies. 3. Prepare the closet floor and apply concrete floor sealer on the floor of the closet. D. Heating, Ventilation, and Air Conditioning: 1. Install the exhaust fan, ceiling-hung cabinet, and exhaust grille per design drawings and specifications (Exhibit 2). 2. Install fire dampers with access panels per the design drawings and specifications (Exhibit 2). 3. Install the wall-mounted intake louver per the design drawings and specifications (Exhibit 2). 4. Install ductwork required and as per the design drawings and specifications (Exhibit 2). 5. Install the temperature sensor as indicated on the design drawings and specifications (Exhibit 2). E. Electrical: 1. Protect the existing Automatic Transfer Switch and transformers, 75kVA on pad in the new closet. 2. Relocate existing panel disconnects, panel 60A Square D disconnect and pull-box, and existing wiring trough, per the design drawings and specifications (Exhibit 2). 3. Relocate existing wiring conduit up to the ceiling with extensions to the new wall. 4. Install duplex receptacle wiring to the spare breaker as indicated on design drawings and specifications (Exhibit 2). 5. Install a new light fixture and controls switch per the design drawings and specifications (Exhibit 2). 6. Raise existing light fixtures as indicated on the design drawings and specifications (Exhibit 2). F. Fire Alarm: 1. Perform all work required to tie-in the new exhaust fan and fire damper to the Fire Alarm panel. 2. Coordinating all work with Siemens, Inc
Post-Bid
Educational
$300,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 13, 2026
June 12, 2026
55 Lexington Ave, New York, NY
Related To This Project
New York, NY
Bid Date: May 12 2026
New York, NY
Bid Date: May 28 2026
New York, NY
Bid Date: May 20 2026
New York, NY
Bid Date: May 26 2026
New York, NY
Bid Date: May 26 2026
New York, NY
Bid Date: May 13 2026
New York, NY
--
New York, NY
Bid Date: Jun 12 2026
New York, NY
Bid Date: May 15 2026
New York, NY
Bid Date: Jun 10 2026
New York, NY
--
New York, NY
Bid Date: Jun 01 2026
New York, NY
Bid Date: May 19 2026
New York, NY
Bid Date: May 05 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
