Published May 11, 2026 at 8:00 PM

Updated May 14, 2026

Site work and new construction of an educational facility in New York, New York. Completed plans call for the construction of a educational facility.

Baruch College - Newman Vertical Campus Fire Alarm Closet Construction. Service-Disabled Veteran-Owned Business (SDVOB) goal: 6.00%. Minority / Women Business Enterprise contracting goals (MWBE): Total MWBE Goals: 30.00%. Question Deadline 04/29/2026 at 11:59 PM ET All questions pertaining to this procurement must be submitted in writing via email to CUNY.Builds@CUNY.edu (MWBE) participation goal of 30% The general contractor must provide construction services in accordance with the Architectural and Engineering Design Documents attached herein as Exhibit 2 (Drawings and Specifications). All work shall be in accordance with all applicable Federal, State, and New York City regulations. The general contractor shall provide all materials and labor in the performance of the Scope of Work which shall consist of, but is not limited to the following: A. Selective Building Demolition: 1. Remove existing panel disconnects, wire trough, panel 60A Square D disconnect, and pull-box as indicated on the design drawings and specifications (Exhibit 2). B. Interior Construction: 1. Construct a fire-rated, metal-framed wall and ceiling assemblies as indicated on the design drawings and specifications (Exhibit 2). 2. Install a Hollow Metal, painted, fire-rated door and frame as indicated on the design drawings and specifications (Exhibit 2). 3. Make any repairs to existing wall and/or ceiling damaged while constructing the new wall and ceiling assemblies. C. Interior Finishes: 1. Paint newly constructed walls and ceilings to match the existing walls and ceilings. 2. Patch and paint any existing wall and/or ceiling surfaces damaged in the process of constructing the new wall and ceiling assemblies. 3. Prepare the closet floor and apply concrete floor sealer on the floor of the closet. D. Heating, Ventilation, and Air Conditioning: 1. Install the exhaust fan, ceiling-hung cabinet, and exhaust grille per design drawings and specifications (Exhibit 2). 2. Install fire dampers with access panels per the design drawings and specifications (Exhibit 2). 3. Install the wall-mounted intake louver per the design drawings and specifications (Exhibit 2). 4. Install ductwork required and as per the design drawings and specifications (Exhibit 2). 5. Install the temperature sensor as indicated on the design drawings and specifications (Exhibit 2). E. Electrical: 1. Protect the existing Automatic Transfer Switch and transformers, 75kVA on pad in the new closet. 2. Relocate existing panel disconnects, panel 60A Square D disconnect and pull-box, and existing wiring trough, per the design drawings and specifications (Exhibit 2). 3. Relocate existing wiring conduit up to the ceiling with extensions to the new wall. 4. Install duplex receptacle wiring to the spare breaker as indicated on design drawings and specifications (Exhibit 2). 5. Install a new light fixture and controls switch per the design drawings and specifications (Exhibit 2). 6. Raise existing light fixtures as indicated on the design drawings and specifications (Exhibit 2). F. Fire Alarm: 1. Perform all work required to tie-in the new exhaust fan and fire damper to the Fire Alarm panel. 2. Coordinating all work with Siemens, Inc

Post-Bid

Educational

$300,000.00

Public - City

New Construction, Site Work

23

22

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,002
Active Projects
459
Bidding Soon
5,164
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2026

June 12, 2026

Project location map

55 Lexington Ave, New York, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.