Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 7, 2026 at 8:00 PM
Updated May 16, 2026
Renovation of an educational facility in Lynn, Massachusetts. Completed plans call for the renovation of a two-story above grade educational facility.
The Project consists of but not limited to: Electrical updates for new rooms and room modifications within the City Arts and Sciences Academy. Rooms are located at Ground Level and First Floor. Location- Fecteau-Leary Middle School 33 N. Common Street, Lynn, MA 01902 The work is estimated to cost $250,000.00. 15.3% for minorities and 6.9% for women A. Work described herein shall be interpreted as work to be done by the Electrical Sub Contractor. Work to be performed by other trades will be referenced to a particular contractor. B. Provide all labor, materials, tools, and equipment, including scaffolding, to complete the installation of the electrical system. Install, equip, adjust, and put into operation the respective portions of the installation specified, and so interconnect various items or sections of work in order to form a complete and operating whole. Systems may be referenced in singular or plural terms, also refer to drawings to confirm quantities. The work shall consist of, but shall not necessarily be limited to the following: 1. Fire alarm system, extension of existing. 2. Emergency lighting and exit signs. 3. Lighting systems interior, including lamps, fixtures, occupancy sensors, controls, etc. 4. All raceway systems, including boxes, couplings, and fittings. 5. All branch circuit wiring systems, including wiring devices, plates, etc. 6. Connections for all building equipment, including mechanical, plumbing, fire protection, elevator and the like. 7. All testing of equipment installed. 8. Any other item of work hereinafter specified or indicated on electrical drawings. 9. Drilling, coring, and cutting of holes (where the largest dimension thereof does not exceed 12 inches) for electrical conduit systems, and equipment. 10. Systems Identification. 11. Scaffolding, Rigging, and Staging required for all Electrical Work. 12. Fire stopping shall be performed by this contractor. 13. Phasing and selective demolition. 14. Technology systems as specified in 270000.
Bid Results
Educational
$292,857.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2026
June 20, 2026
33 N Common St, Lynn, MA
Related To This Project
Lynn, MA
Bid Date: May 06 2026
Lynn, MA
Bid Date: May 12 2026
Lynn, MA
Bid Date: May 19 2026
Lynn, MA
Bid Date: May 28 2026
Lynn, MA
Bid Date: Apr 22 2026
Lynn, MA
Bid Date: Apr 22 2026
Lynn, MA
Bid Date: Apr 01 2026
Lynn, MA
Bid Date: Apr 01 2026
Lynn, MA
Bid Date: Mar 12 2026
Lynn, MA
Bid Date: Mar 11 2026
Lynn, MA
Bid Date: Apr 01 2026
Lynn, MA
Bid Date: Feb 19 2026
Lynn, MA
Bid Date: Feb 19 2026
Lynn, MA
Bid Date: Feb 27 2026
Lynn, MA
Bid Date: Feb 19 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
