BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 7, 2026 at 8:00 PM

Updated May 16, 2026

Renovation of an educational facility in Lynn, Massachusetts. Completed plans call for the renovation of a two-story above grade educational facility.

The Project consists of but not limited to: Electrical updates for new rooms and room modifications within the City Arts and Sciences Academy. Rooms are located at Ground Level and First Floor. Location- Fecteau-Leary Middle School 33 N. Common Street, Lynn, MA 01902 The work is estimated to cost $250,000.00. 15.3% for minorities and 6.9% for women A. Work described herein shall be interpreted as work to be done by the Electrical Sub Contractor. Work to be performed by other trades will be referenced to a particular contractor. B. Provide all labor, materials, tools, and equipment, including scaffolding, to complete the installation of the electrical system. Install, equip, adjust, and put into operation the respective portions of the installation specified, and so interconnect various items or sections of work in order to form a complete and operating whole. Systems may be referenced in singular or plural terms, also refer to drawings to confirm quantities. The work shall consist of, but shall not necessarily be limited to the following: 1. Fire alarm system, extension of existing. 2. Emergency lighting and exit signs. 3. Lighting systems interior, including lamps, fixtures, occupancy sensors, controls, etc. 4. All raceway systems, including boxes, couplings, and fittings. 5. All branch circuit wiring systems, including wiring devices, plates, etc. 6. Connections for all building equipment, including mechanical, plumbing, fire protection, elevator and the like. 7. All testing of equipment installed. 8. Any other item of work hereinafter specified or indicated on electrical drawings. 9. Drilling, coring, and cutting of holes (where the largest dimension thereof does not exceed 12 inches) for electrical conduit systems, and equipment. 10. Systems Identification. 11. Scaffolding, Rigging, and Staging required for all Electrical Work. 12. Fire stopping shall be performed by this contractor. 13. Phasing and selective demolition. 14. Technology systems as specified in 270000.

Bid Results

Educational

$292,857.00

Public - City

Renovation

19

9

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
724
Active Projects
418
Bidding Soon
3,079
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2026

June 20, 2026

Project location map

33 N Common St, Lynn, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.