Published May 14, 2026 at 8:00 PM

Updated May 15, 2026

Site work and new construction of a water / sewer project in Caldwell, Idaho. Completed plans call for the construction of a 1,000-square-foot water / sewer project; and for site work for a water / sewer project.

This project involves the construction and commissioning of DAFT Room No. 2, approximately 1000 sq. ft. and roughly 18 ft. tall, including supporting site, structural, and process improvements. The work includes selective demolition and excavation for new foundations, construction of the DAFT tank foundation and floor slab, installation of a fully welded, watertight DAFT tank, and completion of subgrade piping and structural penetrations for integration with existing and future above-grade systems. Yard improvements include roadway realignment, paving, grading, sidewalks, and protective bollards, along with completion of the building enclosure. The project also requires installation of a complete DAFT No. 2 treatment system, including new sludge pumps, process piping, valves, electrical and control systems, HVAC, plumbing, and a new polymer dosing system. Additional process and utility upgrades must be completed within the Blower/Solids Handling Building. All work must comply with contract documents, be substantially complete by specified dates, and made fully operational. All necessary materials, equipment, labor, taxes, permits, and incidentals must be provided by the contractor. Question Deadline 05/18/2026 at 4:00 PM MT Contact information and submittal procedures for such questions are as follows: A. Alex Schoonen, Project Manager. 1. Phone: 208-649-7554 2. Email: aschoonen@cityofcaldwell.org Instructions to bidders include: - All proposals must be submitted electronically through the City's OpenGov Procurement portal. - A valid Idaho Public Works License is required and must be included in the bid. - Bid security of 5% of the bid amount in the form of a bid bond or certified check must accompany each proposal. - The contractor must furnish payment and performance bonds equal to the contract amount upon award. - Bidders must examine contract documents, visit the site, and consider applicable laws and regulations before submitting a bid. - The City reserves the right to reject any or all bids and to waive informalities not involving price, time, or changes in the work. - Subcontractor lists must be provided as required by law. Failure to comply may render the bid non-responsive. - Bidders must upload all required forms, licenses, and bond documents with their submission. - Bids will remain subject to acceptance for thirty days after bid opening. - Successful bidders must sign the agreement and provide required bonds and insurance within ten days after Notice of Award.

GC Bidding

Water / Sewer

$4,000,000.00

Public - City

New Construction, Site Work

100

53

11

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
23
Bidding Soon
222
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2026

July 27, 2026

Project location map

208 Johnson Ln, Caldwell, ID

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.