Published May 14, 2026 at 8:00 PM

Updated May 15, 2026

Site work and paving for a civil project in Palm Coast, Florida. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

The City of Palm Coast requires a qualified Contractor to furnish all labor, materials, equipment, supervision, permitting, traffic control, and incidentals necessary for the completion of the 19 Central Place Pipe Replacement (S-149-1 & S-149-2) project for the City of Palm Coast. The Contractor shall perform all activities in accordance with the construction plans (Sheets C-1 through C-4), General Notes, and Utility Notes included in the project documents. The project involves the removal of the existing stormwater culvert pipes and the installation of a new 15-inch HDPE drainage system as shown in the plans. This includes pipe installation at the invert elevations indicated in the drawings, proper bedding, backfilling, compaction, and all connections or transitions required to tie the system into existing infrastructure. The Contractor shall also perform any necessary dewatering and temporary cofferdam operations to complete the retaining-wall and pipe-related work in the areas adjacent to the waterway. Utility coordination, including Sunshine 811 notifications and compliance with utility separation requirements, must be maintained throughout the project. The scope additionally includes the construction of a new retaining wall as detailed in the plans, consisting of concrete footing, masonry units with grout and rebar, concrete lintel, finishing components, and temporary bracing against the existing seawall during installation. The Contractor must furnish and place coquina rock rip-rap and any required stone base in the locations indicated in the drawings. Roadway restoration shall be completed by installing a new asphalt patch over the disturbed section of pavement following the pavement section and structural requirements shown in the documents. All disturbed swales, shoulders, and landscaped areas must be regraded and restored with sod to match existing conditions. Throughout construction, the Contractor shall install and maintain all MOT devices required for safe pedestrian and vehicular access, including signs, barricades, markings, and traffic sequencing following FDOT and MUTCD standards. Erosion and sediment control measures such as silt fence, turbidity barriers, temporary stabilization, and maintenance activities must be implemented for the duration of the project. All compaction, density testing, and quality-control requirements shown in the notes must be satisfied before acceptance. Upon completion, the Contractor shall prepare and submit a full set of as-built drawings sealed by a Florida-licensed surveyor, do cumenting all final elevations, invert data, pipeline locations, and any deviations from the approved plans. Final cleanup, restoration, and punch-list completion are required prior to project closeout. Question Deadline 05/07/2026 at 2:00 PM ET Intent to Bid Due Date: May 13th 2026, 2:00 PM EDT

Post-Bid

Water / Sewer

$3,000,000.00

Public - City

Paving, Site Work

6

11

6

6

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2026

June 28, 2026

Project location map

19 Central Pl, Palm Coast, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.