Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 23, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a road / highway in Willard, Missouri. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

US 160 (West Bypass) from Interstate 44 to US 60 (James River Freeway) in Springfield, MO; and on Route FF from US 60 (James River Freeway) to Eagle Ridge Drive in Battlefield. Length: 8.446 miles The method of Contractor Selection has not been Determined at this time. MODOT - RFQ Engineering - Roadway/Intersection Capacity and Operational Improvements

Conceptual

Roads / Highways

$10,000,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
50
Bidding Soon
811
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed