BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 15, 2026

Renovation of a transportation facility in Salt Lake City, Utah. Completed plans call for the renovation of a transportation facility.

The purpose of this project is to restore the HVAC equipment to a like-new, reliable condition, modernize control systems and interfaces, replace obsolete components, update refrigerants, and ensure the HVAC units remain compliant with applicable regulatory requirements for a minimum of 20 additional years of operation. A The UTA Bilevel fleet contains two HVAC units per railcar, each mounted in the roof area near the A-end and B-end of the vehicle. Both units operate together to regulate cabin temperature, ventilation, and air distribution. B The HVAC units include refrigeration systems (compressors, valves, coils, receivers or accumulators, piping), electric heating systems, evaporator and condenser fan assemblies, filtration and airflow switches, and a microprocessor-driven control system. C Each HVAC unit receives primary 480 VAC three-phase power for compressors, heaters, and motors; and 72 VDC control power. The updated controller shall operate within existing vehicle control logic and trainline protocols. D The overhauled HVAC units shall be fully interchangeable within the Bilevel fleet and shall utilize a common refrigerant (R-407C). Question Deadline 05/15/2026 at 2:00 PM MT Questions and Requests for changes to the RFP must be submitted via the Euna Q&A page before the end of the Question and Answer period. UTAs answers to timely questions will be posted on the Euna Q&A page.

GC Bidding

Transportation Terminals

$20,000,000.00

Public - State/Provincial

Renovation

27

123

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2026

July 6, 2026

Project location map

To be determined, Salt Lake City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.