BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 1, 2026 at 8:00 PM

Updated May 15, 2026

Renovation of a medical facility in Jackson, Louisiana. Completed plans call for the renovation of a medical facility.

This project is for the removal and installation of two existing ITU Chiller Systems for the Eastern LA Mental Health System (ELMHS) located at the Eastern Mental Health Hospital 4502 Hwy 951, Jackson, LA 70748. The Contractor shall provide all labor, materials, equipment, supervision, and services necessary to complete the work in accordance with the project specifications. Demolition o Remove existing chillers and associated components. o Properly disconnect all piping, electrical, and controls. o Haul off and legally dispose of all removed equipment. Installation o Install two Carrier 30RC080 or Equal 80 ton chillers in accordance with manufacturer's recommendations. Provide all pipe connections, including: o Chilled water supply and return o Provide insulation for all new piping systems. Hydronic Piping o Furnish and install all required piping connections to integrate new chillers. o Modify existing piping as required for proper system operation. o Provide insulation on all piping per specifications. HVAC Insulation o Insulate all piping associated with chiller installation. o Insulation shall comply with project specifications and energy code requirements. Electrical o Disconnect existing electrical service to chillers. o Reconnect electrical service to new equipment. o Verify proper voltage, phase, and operation. Instrumentation and Controls for Electrical Systems o Disconnect and reconnect HVAC controls. o Ensure full integration with existing building control systems. o Verify proper system communication and functionality. Factory Start-Up o Provide manufacturer-authorized startups for both chillers. Testing o Perform operational checks to confirm: o Proper cooling performance o System balance and flow o Control functionality The following items are specifically excluded from this Contract: o Cutting and patching o Roofing work o Special systems (non-HVAC) o Fireproofing for HVAC penetrations o Structural modifications required for equipment installation o Concrete housekeeping pads Upon Agreement Of The State Of Louisiana Agency And The Contractor, A Term Contract May Be Extended For 2 Additional 12-month Periods At The Same Prices, Terms And Conditions. In Such Cases, The Total Contract Term Cannot Exceed 36 Months.

Post-Bid

Medical

$1,500,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
53
Bidding Soon
632
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2026

July 13, 2026

Project location map

4502 Hwy 951, Jackson, LA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.