Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 20, 2026 at 8:00 PM

Updated May 21, 2026

Demolition, site work and paving for a bridge / tunnel in Terrenceville, Newfoundland. Completed plans call for the demolition of a bridge / tunnel.

Closing Time: 12:00 PM NT Culvert replacements on Route 210 between Swift Current and Terrenceville. Bids must be submitted online. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Question Deadline 05/09/2026 at 12:00 PM NT

Award

Bridges / Tunnels

$724,340.00

Public - City

Demolition, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
9
Bidding Soon
116
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2026

June 25, 2026

Project location map

NL-210, Terrenceville, NL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed