BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 16, 2026

Site work and addition to a transportation facility in Richmond Hill, Ontario. Completed plans call for the addition of a 131,400-square-foot, two-story above grade transportation facility; and for site work for a transportation facility.

The Regional Municipality of York (the Region) is undertaking the next phase of electrification works at the York Region Transit (YRT) Bus Depot located at 55 Orlando Avenue, Richmond Hill, Ontario. The 55 Orlando facility is a key operations hub supporting YRT's conventional, Viva, and specialized transit fleets. The facility was recently expanded to accommodate additional bus storage capacity and to enable the phased implementation of electric bus (E-Bus) infrastructure. The current project will advance the construction of the electrical and supporting infrastructure required to support YRT's transition to a zero-emission fleet. The proposed works will include, but are not limited to: - Installation of E-Bus charging systems and associated distribution infrastructure - Upgrades to the facility's electrical service and power distribution systems - Civil, structural, mechanical, and architectural modifications required to support the electrification works - Integration with existing building systems and operational infrastructure The facility will remain fully operational on a 24-hour, 7-day basis throughout construction. The successful contractor will be required to plan and execute the works in a manner that ensures uninterrupted transit operations, maintains safe access for staff and vehicles, and minimizes operational disruption. Construction is anticipated to be delivered in two phases: - Phase 1 - Completion targeted for Q1 2028 - Phase 2 - Total Completion targeted for 2029 Project Timelines: Establish a list of pre-qualified contractors: August 2026 Issuance of RFT: November 2026 Award of the contract (RFT): April 2027 Construction completion - PHASE 1: January 2028 Documents can be obtained at: https://york.bidsandtenders.ca/ Question Deadline: Fri May 22, 2026 5:00:00 PM (EDT)

GC Bidding

Transportation Terminals

$75,000,000.00

Public - County

Addition, Site Work

95

9

4

3

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
748
Active Projects
378
Bidding Soon
3,563
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2026

July 28, 2026

Project location map

55 Orlando Ave, Richmond Hill, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.