BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 7, 2026 at 8:00 PM

Updated May 16, 2026

Site work and new construction of a water / sewer project in Ocoee, Florida. Completed plans call civil work for a water / sewer project.

Question Deadline 05/19/2026 at 2:00 PM ET All questions regarding this ITB shall be in writing and directed to Alexis Chentouf, Purchasing Technician, achentouf@ocoee.org. All Work for the Projectshall be constructed in accordance with the drawings and specifications and the Contact Documents prepared by CPH and the City of Ocoee Utilities Department. The proposed project will be awarded and constructed, in conformance with the plans, specifications, and City of Ocoee Engineering Standards Manual. Bidsshall be deemed to include all items necessary for the furnishing, delivering, and installing of all materials, equipment, incidentals, and services, including all labor for the work which is generally described as the following A. The project consists of the installation of approximately 225 lineal feet (LF) of 8-inch Polyvinyl Chloride (PVC) force main by open-cut installation, 1,610 LF of 10-inch HighDensity Polyethylene (HDPE) force main by directional drill installation, and 41 LF of 20-inch steel casing by Jack and Bore installation under Florida Central Railroad (FCEN) rightof way. Installation also includes connections to existing force mains, valves, fittings, pressure testing, bypass pumping, pipe grouting and abandoning, open cut and restoration of roadway, driveways, curb, sodding, seeding and other restoration as may be required. B. All work must be in compliance with the City of Ocoee Engineering Standards Manual. All work activitiesshall be required to be in accordance with the permitsissued by the respective agencies. All work performed will be required to be done while maintaining the functional operation of the existing force mains. The project consists of the installation of approximately 225 lineal feet (LF) of 8-inch Polyvinyl Chloride (PVC) force main by open-cut installation, 1,610 LF of 10-inch High-Density Polyethylene (HDPE) force main by directional drill installation, and 41 LF of 20-inch steel casing by Jack and Bore installation under Florida Central Railroad (FCEN) right-of way. Installation also includes connections to existing force mains, valves, fittings, pressure testing, bypass pumping, pipe grouting and abandoning, open cut and restoration of roadway, driveways, curb, sodding, seeding and other restoration as may be required. All work must be in compliance with the City of Ocoee Engineering Standards Manual. All work activities shall be required to be in accordance with the permits issued by the respective agencies. All work performed will be required to be done while maintaining the functional operation of the existing force mains.

Sub-Bidding

Water / Sewer

$1,108,000.00

Public - City

New Construction, Site Work

13

19

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
380
Active Projects
158
Bidding Soon
2,152
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2026

July 17, 2026

Project location map

Clarke Road, Ocoee, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.