BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 27, 2026 at 8:00 PM

Updated May 19, 2026

Demolition and site work for a water / sewer project in Atlanta, Missouri. Completed plans call for the demolition of a water / sewer project; and water / sewer project.

The project consists of the installation of approximately 11,400 lineal feet of 6" waterline, approximately 2,300 lineal feet of 3" waterline, small quantities of 4" and 2" waterline, related appurtenances, and demolition of the existing standpipe to complete the improvements. Bids shall be on a Unit Price and Lump Sum basis as indicated on the bid form. Bidders must deposit bid security in the amount, form, and subject to the conditions provided in the Information for Bidders. No bidder may withdraw a bid within 90 days after opening. Bidders are required to observe conditions of employment, Davis Bacon and/or State Prevailing wage rates, Segregated Facility, Section 109, and E.O. 11246. MBE, WBE, and Section 3-DBE bidders are encouraged. The project is financed through the Missouri State Revolving Fund and is subject to American Iron and Steel (AIS) and Buy American, Build American (BABA) requirements. The owner reserves the right to waive informalities or reject any or all bids.

Sub-Bidding

Water / Sewer

$2,000,000.00

Public - City

Demolition, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
36
Bidding Soon
326
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2026

July 18, 2026

Project location map

104 E Main Street, Atlanta, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.