BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 31, 2026 at 8:00 PM

Updated August 6, 2026

Renovation of a mixed-use development in McClellan, California. Completed plans call for the renovation of a medical facility.

Amendment 0008 has been posted on 7/30/2026 -the purpose of this amendment is the following: To provide RFI Responses. Amendment 0007 has been posted on 7/17/2026 -the purpose of this amendment is the following: To provide RFI Responses. All other terms and conditions remain unchanged and in full force and effect. Amendment 0006 has been posted on 7/15/2026 -the purpose of this amendment is the following: 1. To extend the Receipt of Offerors to Friday, July 31st, 2026, at 12:00 PM PT. 2. To provide revised Instruction to Offerors. 3. To provide RFI Responses. 4. All other terms and conditions remain unchanged and in full force and effect. Amendment 0005 has been posted on 7/8/2026 -the purpose of this amendment is the following: Remove Clauses 52.232-5, 52.249-2, 52.249-10 from the solicitation. Add Clauses 52.212-4, 52.246.21, and VA Specific Special Contract Clause, Payments under Fixed-Price Construction Contracts. To provide RFI Responses. To provide additional documentation to include revised specifications, Fire Protection Design Guide, and Sole Source Documentation. To extend the Receipt of Offers to 7/24/2026 by 12:00 PM PT. All other terms and conditions remain unchanged and in full force and effect. Amendment 0004 has been posted on 7/2/2026 - the purpose of this amendment is to extend the proposal due date to July 17th, 2026 at 12:00 PM PT Amendment 0003 has been posted on 6/18/2026 - the purpose of this amendment is to extend the proposal due date to July 7th, 2026 at 12:00 PM PT. Amendment 0002 has been posted on 6/9/2026 with the attachment of the RFI Question Template in word version. Amendment 0001 has been posted on 6/8/2026 with the attachments for the RFI Question Template, and Sign-in Sheet from the recent site-walk. This amendment will extend the RFI submission deadline from 6/9/2026 to 6/11/2026. Replace the existing fire alarm and security alarm systems in Buildings 911 and 98 by providing all labor, equipment, materials, tools, and supplies necessary to complete construction in accordance with the drawings, specifications, and applicable Davis-Bacon wage requirements. The work includes removal of existing systems and installation of new, fully functional fire and security alarm systems to support continued operation of the medical center. All construction services shall be performed in compliance with contract requirements, applicable codes, and standards. RFIs are due on : Tuesday, June 9th, 2026, by 9:00 AM PT. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Estimated Magnitude: $2,000,000-5,000,000 PN - 612-26-3-6056-0066

Post-Bid

Medical

$5,000,000.00

Public - Federal

Renovation

38

24

2

4

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
476
Active Projects
194
Bidding Soon
2,623
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2026

August 10, 2026

Project location map

5443 Dudley Blvd, McClellan, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.