Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 12, 2026 at 8:00 PM
Updated May 14, 2026
Site work and new construction of a recreation facility in Orlando, Florida. Completed plans call for the construction of a recreation facility.
Notice is hereby given that City of Orlando is accepting sealed responses for Design-Build Services for Event Center. Respondents are solely responsible for ensuring that their submittals are complete, uploaded, and submitted electronically via OpenGov by the due date and time. The City shall not be responsible for any submission delays or failures. Respondents are expected to examine this solicitation, specifications, associated drawings, if any, and all instructions. Failure to do so will be at the Respondent's risk. Each Respondent shall furnish the information required on each submittal form and each accompanying sheet thereof on which an entry is made. Question Submission Deadline:May 18, 2026, 5:00pm A. The Event Center is envisioned as a natural extension of the Sports & Entertainment District in Orlando. Positioned adjacent to Camping World Stadium, its surrounding fields, and Lake Lorna Doone, the facility is embedded within an already active recreational landscape. Moving east along Church Street, the Event Center strengthens its connection to the broader district, linking to Inter & Co Stadium and the Kia Center. In this context, Church Street serves as a dynamic spine--energizing the area'sidentity as a destination for athletics, events, and community gathering--while the new Event Center takes its place among these established venues. B. This Project consists of the development of the approximately 140,000-square-foot facility, situated on a four-acre site. At its core, the building is organized around a central field house that accommodates a wide range of multi-sport activities and civic events. Supporting this primary space are key program elements including a welcoming main lobby, concessions, flexible locker rooms, viewing mezzanine, adaptive banquet and event hall, and essential back-of-house functions. Together, these components create a cohesive and adaptable environment capable of serving both large-scale events and private, boutique offerings. C. Through a series of programming studies, design iterations, and stakeholder coordination meetings, the project has been carefully refined to align with both the operational goals and budgetary parameters of stakeholders. The result is a thoughtfully resolved design that balances performance, flexibility, and user experience. D. The attached Design Criteria Package (Exhibit "E" - Design Criteria Package) communicates the foundational elements of the project, including applicable codes, the confirmed program, narratives, building design, and specifications. Collectively, these materials communicate a clear vision for the building's design intent, operational functionality, and long-term performance objectives.
GC Bidding
Amusement and Recreation
$50,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 27, 2026
January 27, 2027
400 S Orange Ave, Orlando, FL
Related To This Project
Orlando, FL
Bid Date: May 12 2026
Orlando, FL
Bid Date: May 12 2026
Orlando, FL
--
Orlando, FL
--
Orlando, FL
Bid Date: May 19 2026
Orlando, FL
Bid Date: May 11 2026
Orlando, FL
Bid Date: Jun 09 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
