Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published July 8, 2026 at 8:00 PM
Updated July 14, 2026
Site work and paving for a mixed-use development in Bemidji, Minnesota. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
https://www.bemidjipioneer.com/news/local/bemidji-announces-1-week-detour-on-5th-street-nw-as-part-of-bike-trail-project Bemidji announces 1-week detour on 5th Street NW as part of bike trail project The city will replace an existing railroad crossing on Fifth Street NW from Jefferson Avenue NW to Park Avenue NW. The closure and subsequent detour will last from Monday, June 22, to Friday, June 26. 061326.N.BP.CONSTRUCTION A city rendering details the detour for the Fifth Street NW trail project that is set to begin on Monday, June 22, 2026.Courtesy / City of Bemidji By Pioneer Staff Report June 16, 2026 at 10:45 AM Listen Comments Share News Reporting This article is free to access. We've opened this article to everyone as a public service. Please consider supporting our work for just $2. View subscription offers BEMIDJI — The city of Bemidji is set to construct a new bike trail along Fifth Street NW, starting work on Monday, June 22, with work expected to be complete by Friday, June 26. As part of this project, the city will replace an existing railroad crossing and is required to fully close a portion of Fifth Street NW from Jefferson Avenue NW to Park Avenue NW. Timberlyne Wood Products fire The city will operate a detour route that is expected to last the same timeline as the overall bike trail project. The detour route will feature signage to guide motorists by using Adams Avenue NW, 15th Street NW and Irvine Avenue NW. Those with questions can contact the Bemidji Engineering Department at (218) 333-1850. ------------------------------ Remove 1,225 linear feet of curb and gutter; remove 5,950 square yards of bituminous pavement; saw 6,000 linear feet of bituminous pavement; remove 1,850 linear feet of pavement marking; remove 3,000 square feet of concrete walk; install 4,300 tons of Aggregate Base Class 5; place 330 tons of Type SP 9.5 Bituminous and 1,700 tons of Type SP 12.5 Bituminous; construct 5,600 linear feet of concrete curb and gutter types B618 and D418; install 250 square feet of 4-inch concrete walk, 2,500 square feet of 6-inch concrete walk, and 270 square yards of 6-inch concrete pavement; establish turf on 0.19 acre; install 210 linear feet of 12-inch to 15-inch RC Pipe Sewer Class III; construct 32 linear feet of drainage structure design F; install 160 linear feet of 24-inch solid line ground in; apply 6,350 linear feet of 4-inch solid line paint and 1,200 linear feet of 4-inch double solid line paint. Work is located at 5th Street NW, Bemidji, Beltrami, MN.
Award
Sidewalks / Parking Lot
$855,960.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 20, 2026
July 6, 2026
5th St NW, Bemidji, MN
Related To This Project
Bemidji, MN
--
Bemidji, MN
Bid Date: Jun 06 2026
Bemidji, MN
Bid Date: Jun 08 2026
Bemidji, MN
Bid Date: Jul 09 2026
Bemidji, MN
Bid Date: Aug 05 2026
Bemidji, MN
Bid Date: Jul 14 2026
Bemidji, MN
Bid Date: Sep 01 2026
Bemidji, MN
Bid Date: Sep 01 2026
Bemidji, MN
Bid Date: May 21 2026
Bemidji, MN
Bid Date: May 05 2026
Bemidji, MN
Bid Date: Jun 04 2026
Bemidji, MN
Bid Date: May 13 2026
Bemidji, MN
Bid Date: May 13 2026
Bemidji, MN
Bid Date: Mar 31 2026
Bemidji, MN
Bid Date: Apr 14 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed