BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 14, 2026

Renovation of a mixed-use development in Rock Hill, South Carolina. Completed plans call for the renovation of a educational facility.

Reference Number 0000422157 The District is seeking bids for renovations at the Carroll School. The Carroll school is a historical building owened by the Rock Hil School District for educational experiences outside the classroom. Question Deadline 05/08/2026 at 12:00 PM ET Questions pertaining to the terms and specifications shall be directed to Wfaris@rhmail.org . The bid number must be referenced in the subject line. Questions are submitted online Yes Performance Bond 100 % Payment Bond 100 % 1. PROJECT OVERVIEW The Contractor shall provide all labor, materials, equipment, supervision, and incidentals necessary to complete exterior demolition, structural repairs, installation of new building components, and finishing work at Carroll School. All work shall comply with applicable codes and standards. 2. DEMOLITION Remove and dispose of existing siding and damaged wood. Provide dumpsters and maintain safe, clean work areas. 3. STRUCTURAL FRAMING REPAIRS Replace approximately 30 wall studs and 60 linear feet of sill plate. Install OSB sheathing on repaired sections. 4. WEATHER BARRIER SYSTEM Install commercial-grade house wrap with sealed seams and penetrations. 5. EXTERIOR WALL SYSTEM (SIDING) Install fiber cement siding (Hardie or equal) with trim, flashing, and accessories. 6. WINDOWS Install 22 windows (3'0" x 7'6") and 2 windows (3'0" x 5'6") with flashing and sealing. 7. DOORS Install one double door and one single fiberglass door with hardware and weatherproofing. 8. INSULATION Install R-13 batt insulation in all exterior walls. 9. VAPOR BARRIER Install plastic vapor barrier in crawl space. 10. VENTILATION Install 4 electric foundation vents and 4 gable vents with required electrical work. 11. EXTERIOR FEATURES Install awning, handrails, and tongue-and-groove porch ceiling. 12. PAINTING Paint all exterior surfaces which includes siding, doors, trim, and features. 13. SAFETY Provide temporary fencing and maintain ADA access at all times. 14. EQUIPMENT & SUPERVISION Provide necessary equipment and full-time supervision. 15. CLEANUP Provide ongoing and final site cleanup. 16. PROJECT DURATION Estimated duration is approximately 8 weeks. Project will need to be started and completed between 6/1/2026 to 7/31/26.

GC Bidding

Educational

$300,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
81
Bidding Soon
1,297
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2026

June 1, 2026

Project location map

4789 Mobley Store Rd, Rock Hill, SC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.