BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 7, 2026 at 8:00 PM

Updated May 16, 2026

Site work and new construction of a water / sewer project in New Braunfels, Texas. Completed plans call for the construction of a water / sewer project.

New Braunfels Utilities ("NBU") is soliciting Request for Proposals/Bids ("RFP") for FM 1101 Pump Station. *Online Bid open info: Respondents may also participate in the videoconference by telephone at +1469-998-7414. If joining via telephone number, the phone conference ID is: 591413 295#. Both the link and telephone number are free of charge. Questions regarding this RFP or the services requested must be sent to the Purchasing Manager at purchasing@nbutexas.com. NBU shall accept requests for additional information or clarification concerning this RFP on or before 4:00 PM CT, May 19, 2026. NBU shall not answer any questions submitted after 4:00 PM CT, May 19, 2026. NBU shall have a reasonable amount of time to respond to questions or concerns regarding the RFP SCOPE OF WORK NBU anticipates the following items will be included in the Project scope of work: The Project is anticipated to include some or all of the following items within its scope: Construction of (i) new 7.5 million gallon per day ("MGD") potable water pump station; (ii) incoming potable water supply line and flow control valve station; (iii) 2.5 million gallon pre-stressed concrete ground storage tank; (iv) booster pump building with horizontal split case pumps; (v) concrete masonry unit ("CMU") control building; (vi) electrical, instrumentation, controls, SCADA system; (vii) motor control center and variable frequency drives; (viii) diesel generator; (ix) perimeter fencing and site security; (x) site improvements; and (xi) all other appurtenances necessary to complete the Project. The Project will be designed and constructed so as to meet all applicable federal, state, and local accessibility standards. The selected Offeror will be also responsible for obtaining all applicable permits and inspections; providing all necessary performance and payment bonds and insurance requirements; and providing NBU with all manufacturers' warranties and all operations and maintenance (O & M) manuals for all equipment installed. The selected Offeror may be required to perform some or all of the following preconstruction and construction services. Preconstruction Services may include, but not necessarily be limited to, planning and value engineering the Work. Construction Services may include, but not necessarily be limited to, all work associated with construction, occupancy and warranty of the facilities

GC Bidding

Water / Sewer

$16,900,000.00

Public - City

New Construction, Site Work

95

31

6

4

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
272
Active Projects
97
Bidding Soon
2,087
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2026

September 15, 2026

Project location map

788 Barbarosa Rd, New Braunfels, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.