Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 3, 2026 at 8:00 PM
Updated May 20, 2026
Demolition, site work and paving for a mixed-use development in Addison, Illinois. Completed plans call civil work for a road / highway, sidewalk / parking lot and water / sewer project.
This rehabilitation project consists of replacement and abandonment of existing water main and appurtenances, road patching and resurfacing, removal and disposal of unsuitable material, driveway removal and replacement, curb and gutter removal and replacement, sidewalk removal and replacement, installation of ADA compliant detectable warnings and ramps, installation of storm sewer and underdrain, miscellaneous structure adjustments, reconstruction or replacement of utility structures, tree preservation, installation of new parkway trees, and the restoration along the affected portions of work limits. The work will take place on Rozanne Dr, Lenore St & Mavis Ln. Various Locations - 2026 Addison Water Main Replacement & Resurfacing The following mitigation measures shall be carried out as required under the Mitigation Plan within the corresponding project Environmental Review Record: 1. Floodplain Management - This project will include planting of new parkway trees. The project will also include installation of storm sewer and underdrain. Construction operations will be confined to the minimum construction limits and minimum durations with immediate restoration. Watermain and roadwork within the floodplain shall only remove and replace pavement at the same elevation and will not increase the elevation. The project footprint will be closely monitored, and all necessary steps taken during the construction phase to minimize disturbance. No materials or equipment will be stored within the floodplain. No work may take place within the floodway, including storage of materials or equipment. The Subrecipient will be responsible for implementing all mitigation measures, which will be clearly contained within the bid specification manual distributed to interested bidders. Additionally, the Subrecipient and selected contractor performing construction at the project location; and 2. Project Mitigation Plan - DuPage County will enforce required mitigation measures via the CDBG written Agreement, which will be executed by both DuPage County and the Subrecipient. The Subrecipient will be responsible for implementing all mitigation measures, which will be clearly contained within the bid specification manual distributed to interested bidders. Additionally, the Subrecipient will ensure all mitigation measures are contained with the contract between Subrecipient and selected contractor performing construction at project location. The Subrecipient will also be responsible for monitoring mitigation measures to ensure all compliance is met. The Subrecipient will provide necessary supporting documentation/evidence to demonstrate mitigation compliance per the mitigation plan. 1. Until further notice the goal for women participation is 6.9% (Nationwide). 2. Until further notice the goal for minority participation is 19.6% (Chicago PMSA).
Post-Bid
Water / Sewer
$500,000.00
Public - City
Demolition, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 19, 2026
July 3, 2026
Multiple Locations, Addison, IL
Related To This Project
Addison, IL
Bid Date: Apr 27 2026
Addison, IL
Bid Date: May 18 2026
Addison, IL
Bid Date: May 07 2026
Addison, IL
Bid Date: May 11 2026
Addison, IL
Bid Date: May 07 2026
Addison, IL
Bid Date: Apr 13 2026
Addison, IL
Bid Date: Apr 20 2026
Addison, IL
Bid Date: Apr 20 2026
Addison, IL
Bid Date: Mar 26 2026
Addison, IL
Bid Date: Mar 02 2026
Addison, IL
Bid Date: Mar 23 2026
Addison, IL
Bid Date: Mar 05 2026
Addison, IL
Bid Date: Feb 23 2026
Addison, IL
Bid Date: Feb 27 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
