BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 3, 2026 at 8:00 PM

Updated May 20, 2026

Demolition, site work and paving for a mixed-use development in Addison, Illinois. Completed plans call civil work for a road / highway, sidewalk / parking lot and water / sewer project.

This rehabilitation project consists of replacement and abandonment of existing water main and appurtenances, road patching and resurfacing, removal and disposal of unsuitable material, driveway removal and replacement, curb and gutter removal and replacement, sidewalk removal and replacement, installation of ADA compliant detectable warnings and ramps, installation of storm sewer and underdrain, miscellaneous structure adjustments, reconstruction or replacement of utility structures, tree preservation, installation of new parkway trees, and the restoration along the affected portions of work limits. The work will take place on Rozanne Dr, Lenore St & Mavis Ln. Various Locations - 2026 Addison Water Main Replacement & Resurfacing The following mitigation measures shall be carried out as required under the Mitigation Plan within the corresponding project Environmental Review Record: 1. Floodplain Management - This project will include planting of new parkway trees. The project will also include installation of storm sewer and underdrain. Construction operations will be confined to the minimum construction limits and minimum durations with immediate restoration. Watermain and roadwork within the floodplain shall only remove and replace pavement at the same elevation and will not increase the elevation. The project footprint will be closely monitored, and all necessary steps taken during the construction phase to minimize disturbance. No materials or equipment will be stored within the floodplain. No work may take place within the floodway, including storage of materials or equipment. The Subrecipient will be responsible for implementing all mitigation measures, which will be clearly contained within the bid specification manual distributed to interested bidders. Additionally, the Subrecipient and selected contractor performing construction at the project location; and 2. Project Mitigation Plan - DuPage County will enforce required mitigation measures via the CDBG written Agreement, which will be executed by both DuPage County and the Subrecipient. The Subrecipient will be responsible for implementing all mitigation measures, which will be clearly contained within the bid specification manual distributed to interested bidders. Additionally, the Subrecipient will ensure all mitigation measures are contained with the contract between Subrecipient and selected contractor performing construction at project location. The Subrecipient will also be responsible for monitoring mitigation measures to ensure all compliance is met. The Subrecipient will provide necessary supporting documentation/evidence to demonstrate mitigation compliance per the mitigation plan. 1. Until further notice the goal for women participation is 6.9% (Nationwide). 2. Until further notice the goal for minority participation is 19.6% (Chicago PMSA).

Post-Bid

Water / Sewer

$500,000.00

Public - City

Demolition, Paving, Site Work

5

15

3

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
618
Active Projects
323
Bidding Soon
4,834
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2026

July 3, 2026

Project location map

Multiple Locations, Addison, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.