BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 23, 2026 at 8:00 PM

Updated July 8, 2026

Renovation of a theater / auditorium in Winnipeg, Manitoba. Working plans call for the renovation of a theater / auditorium.

The Centennial Concert Hall's communications systems that support the production of live entertainment are original to the construction of the building. These systems are well past their designed life cycle and behind advancements in technology, and current show productions warrant a need for these systems to be upgraded. These communication systems allow for actors and production staff to see and hear real-time audio and video so that they can hit their cues during costume or scene changes. These systems are critical to all shows and productions that take place on the stage. This project replaces all existing production communications systems. The new system will include new digital audio for program and paging distributed throughout backstage dressing rooms, hallways, production offices along with front of house areas. The addition of live video to dressing rooms, offices and screens located throughout the front of house will be a drastic improvement. Video will also be used with an infrared camera located on the balcony rail during black-out cues to see when a set change is completed and the next cue is called to continue the show. A wireless production network will be installed which will allow actors, production staff to communicate digitally on a private and secured network. The addition of a wired and wireless "Clear Com" system used by production staff with headphones will allow departments such as audio and lighting to communicate amongst themselves during setup and technical rehearsals, limiting unwanted chatter from other departments, and then join together during showtime. The systems, once completed, will be a seamlessly integrated paging and program sound system, updated Wi-Fi network, and a complete video distribution system. TIMELINE: Tender was not awarded due to the tender being significantly over budget. Future of project undetermined at this time. Updates will be made late 2026, or upon re-issue of tender for construction.

Final Planning

Theaters / Auditoriums

$250,000.00

Public - City

Renovation

37

5

8

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
39
Bidding Soon
608
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2026

August 4, 2026

Project location map

555 Main St, Winnipeg, MB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.