BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 7, 2026 at 8:00 PM

Updated May 16, 2026

Demolition, site work, paving, outdoor lighting and new construction of a mixed-use development in Montgomery, Alabama. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; for outdoor lighting for a road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

for constructing the Roadway Improvements/Additional Lanes (Grading, Drainage, Pavement, Bridge Replacement, Traffic Signs, Lighting, Traffic Signals, Intelligent Traffic Signals (ITS), Retaining Walls, and Sanitary Sewer) on I-85 from a point north of the Taylor Road Interchange to a point south of Jenkins Creek in Montgomery. Length 2.318 mi. The Bracket Estimate on this project is from $53,758,419 to $65,704,735 . Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 001 - Roadway Improvements/Additional Lanes (Grading, Drainage, Pavement, Bridge Replacement, Traffic Signs, Lighting, Traffic Signals), Retaining Walls, and Sanitary Sewer) on I-85 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Bridges / Tunnels

$65,704,735.00

Public - State/Provincial

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
40
Bidding Soon
553
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2026

July 28, 2026

Project location map

I-85, Montgomery, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.