Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 22, 2026 at 8:00 PM

Updated July 7, 2026

Demolition, site work, paving and new construction of an industrial development in Winnipeg, Manitoba. Completed plans call for the demolition of a 2,912-square-foot industrial development.

Demolition of an existing wood frame building including concrete foundation and floor, construction of a granular base course foundation pad, and the complete construction of a heated equipment storage shed (56' x 52'), including asphalt apron and swale at the Gladstone Maintenance Yard. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Question Deadline 05/20/2026 at 12:00 PM CT

Award

Industrial

$894,809.00

Public - City

Demolition, New Construction, Paving, Site Work

17

7

2

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
58
Bidding Soon
554
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2026

July 6, 2026

Project location map

1630 215 Garry St, Winnipeg, MB

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed